Mean-variance model for the build-operate-transfer scheme under demand uncertainty

被引:47
作者
Chen, A [1 ]
Subprasom, K [1 ]
Ji, ZW [1 ]
机构
[1] Utah State Univ, Dept Civil & Environm Engn, Logan, UT 84322 USA
来源
TRANSPORTATION NETWORK MODELING 2003: PLANNNING AND ADMINISTRATION | 2003年 / 1857期
关键词
D O I
10.3141/1857-11
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
A mean-variance model was developed for determining the optimal toll and capacity in a build-operate-transfer (BOT) roadway project subject to traffic demand uncertainty. This mean-variance model involves two objectives: maximizing mean profit and minimizing the variance (or standard deviation) of profit. The variance associated with profit is considered as a risk. Because maximizing expected profit and minimizing risk are often conflicting, there may not be a single best solution that can simultaneously optimize both objectives. Hence, it is necessary to explicitly consider this as a multiobjective problem so that a set of nondominated solutions can be generated. In this study, the optimal toll and capacity selection for the BOT problem under demand uncertainty is formulated as a special case of the stochastic network design problem. A simulation-based multiobjective genetic algorithm was developed to solve this stochastic bilevel mathematical programming formulation. Numerical results are also presented as a case study.
引用
收藏
页码:93 / 101
页数:9
相关论文
共 23 条
[1]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[2]  
[Anonymous], 1995, PRIVATIZED INFRASTRU
[3]  
[Anonymous], P 9 INT S TRANSP TRA
[4]  
Chen A, 2001, TRANSPORT RES REC, P124
[5]  
CHEN A, 2000, 6 INT C APPL ADV TEC
[6]  
Chen A, 1999, 78 ANN M TRANSP RES
[7]  
CHEN A, 2002, SIMULATION BASED GEN
[8]  
Deb K., 2001, Multi-Objective Optimization using Evolutionary Algorithms
[9]  
Downer J. W, 1992, P 16 AUSTR ROAD RES, P153
[10]  
EURITT MA, 1994, OVERVIEW HIGHWAY PRI