Managing components for assemble-to-order products with lead-time-dependent pricing: The full-shipment model

被引:10
作者
Hsu, Vernon Ning
Lee, Chung Yee
So, Kut C. [1 ]
机构
[1] Univ Calif Irvine, Irvine, CA 92697 USA
[2] George Mason Univ, Sch Management, Fairfax, VA 22030 USA
[3] Hong Kong Univ Sci & Technol, Dept Ind Engn & Logist Management, Kowloon, Peoples R China
关键词
inventory management; assemble-to-order systems; contract manufacturing; optimal stocking policies; leadtime management;
D O I
10.1002/nav.20223
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We study a component inventory planning problem in an assemble-to-order environment faced by many contract manufacturers in which both quick delivery and efficient management of component inventory are crucial for the manufacturers to achieve profitability in a highly competitive market. Extending a recent study in a similar problem setting by the same authors, we analyze an optimization model for determining the optimal component stocking decision for a contract manufacturer facing an uncertain future demand, where product price depends on the delivery times. In contrast to our earlier work, this paper considers the situation where the contract manufacturer needs to deliver the full order quantity in one single shipment. This delivery requirement is appropriate for many industries, such as the garment and toy industries, where the economies of scale in transportation is essential. We develop efficient solution procedures for solving this optimization problem. We use our model results to illustrate how the different model parameters affect the optimal solution. We also compare the results under this full-shipment model with those from our earlier work that allows for multiple partial shipments. (c) 2007 Wiley Periodicals, Inc.
引用
收藏
页码:510 / 523
页数:14
相关论文
共 15 条
[1]  
Barlow RE, 1975, STAT THEORY RELIABIL
[2]  
CHU CB, 1993, NAV RES LOG, V40, P933, DOI 10.1002/1520-6750(199312)40:7<933::AID-NAV3220400706>3.0.CO
[3]  
2-8
[4]  
FU K, 2006, OPTIMAL COMPONENT AQ
[5]   Inventory and production decisions for an assemble-to-order system with uncertain demand and limited assembly capacity [J].
Fu, Ke ;
Hsu, Vernon Ning ;
Lee, Chung-Yee .
OPERATIONS RESEARCH, 2006, 54 (06) :1137-1150
[6]  
Gurnani H, 1996, IIE TRANS, V28, P865
[7]   SETTING SAFETY LEADTIMES FOR PURCHASED COMPONENTS IN ASSEMBLY SYSTEMS [J].
HOPP, WJ ;
SPEARMAN, ML .
IIE TRANSACTIONS, 1993, 25 (02) :2-11
[8]  
Hsu VN, 2006, MANAGE SCI, V52, P337, DOI 10.1287/mnsc.1050.0438
[9]   COMPONENT INVENTORY COSTS IN AN ASSEMBLY PROBLEM WITH UNCERTAIN SUPPLIER LEAD-TIMES [J].
KUMAR, A .
IIE TRANSACTIONS, 1989, 21 (02) :112-121
[10]  
Magretta Joan, 1998, HONG KONG STYLE INTE, P104