Modeling multiple stage manufacturing systems with generalized costs and capacity issues

被引:15
作者
Simpson, NC
Erenguc, SS [1 ]
机构
[1] Univ Florida, Coll Business, Dept Decis & Informat Sci, Gainesville, FL 32611 USA
[2] SUNY Buffalo, Dept Management Sci & Syst, Sch Management, Buffalo, NY 14260 USA
关键词
multiple stage product planning; capacity constraints; joint set-ups;
D O I
10.1002/nav.20097
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
This study introduces one modeling methodology that describes a broad range of multiple stage production planning issues, including multiple limited resources with setup times and joint fixed cost relationships. An existing production system is modeled in this fashion, creating a new set of 1350 highly generalized benchmark problems. A computational study is conducted with the 1350 benchmark problems introduced in this Paper and 2100 benchmark problems, with more restrictive assumptions, from the existing literature. The relative merits of a decomposition-based algorithm and a neighborhood search technique known as NIPPA, or the Non-sequential Incremental Part Period Algorithm, are assessed. NIPPA is generally the more successful of the two techniques, although there are specific instances in which the decomposition-based algorithm displayed a distinct advantage. (c) 2005 Wiley Periodicals, Inc.
引用
收藏
页码:560 / 570
页数:11
相关论文
共 35 条
[1]   OPTIMAL LOT-SIZING ALGORITHMS FOR COMPLEX PRODUCT STRUCTURES [J].
AFENTAKIS, P ;
GAVISH, B .
OPERATIONS RESEARCH, 1986, 34 (02) :237-249
[2]   COMPUTATIONALLY EFFICIENT OPTIMAL-SOLUTIONS TO THE LOT-SIZING PROBLEM IN MULTISTAGE ASSEMBLY SYSTEMS [J].
AFENTAKIS, P ;
GAVISH, B ;
KARMARKAR, U .
MANAGEMENT SCIENCE, 1984, 30 (02) :222-239
[3]   Analysis of solution space-dependent performance of simulated annealing:: the case of the multi-level capacitated lot sizing problem [J].
Barbarosoglu, G ;
Özdamar, L .
COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (09) :895-903
[4]  
Biggs J. R., 1979, Decision Sciences, V10, P96, DOI 10.1111/j.1540-5915.1979.tb00010.x
[5]  
BIGGS JA, 1977, PROD INVENTORY MANAG, V18, P107
[7]   MATHEMATICAL-PROGRAMMING APPROACHES TO CAPACITY-CONSTRAINED MRP SYSTEMS - REVIEW, FORMULATION AND PROBLEM REDUCTION [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1983, 29 (10) :1126-1141
[8]   HEURISTICS FOR MULTILEVEL LOT-SIZING WITH A BOTTLENECK [J].
BILLINGTON, PJ ;
MCCLAIN, JO ;
THOMAS, LJ .
MANAGEMENT SCIENCE, 1986, 32 (08) :989-1006
[9]   IMPROVED HEURISTICS FOR MULTISTAGE REQUIREMENTS PLANNING SYSTEMS [J].
BLACKBURN, JD ;
MILLEN, RA .
MANAGEMENT SCIENCE, 1982, 28 (01) :44-56
[10]  
BOOKBINDER JH, 1990, J OPERATIONS MANAGEM, V9, P7, DOI DOI 10.1016/0272-6963(90)90143-2