A survey of the bidding practices of Canadian civil engineering construction contractors

被引:38
作者
Fayek, A [1 ]
Ghoshal, I [1 ]
AbouRizk, S [1 ]
机构
[1] Univ Alberta, Dept Civil & Environm Engn, Edmonton, AB T6G 2G7, Canada
关键词
bidding; markup; risk analysis; surveys; tendering;
D O I
10.1139/cjce-26-1-13
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents the findings of a survey of the bidding practices of Canadian civil engineering construction contractors. The results of the survey provide insight into the most important factors that contractors consider in making four bid decisions: the decision to bid, the risk allowance, the opportunity allowance, and the markup-size decision. The survey methodology is described to illustrate its effectiveness. Common practices in assessing risks and opportunities, the competition, and markup are discussed. A major conclusion of this paper is that the decision-making process used in bidding is largely subjective and based on experienced judgement. The assessment of the competition is done on an informal basis in most cases, with little use of historical competitor data. Risk and opportunity assessment is subjective and largely based on experience. Although the markup-size decision is critical to the success of a company in achieving its objectives and realizing a profit, markup setting is usually based on experience, with little or no formal methods of analysis.
引用
收藏
页码:13 / 25
页数:13
相关论文
共 10 条
[1]  
Ahmad I., 1988, J MANAGE ENG, V4, P229, DOI DOI 10.1061/(ASCE)9742-597X(1988)4:3(229)
[2]  
[Anonymous], COST ENG
[3]  
FAYEK A, 1996, THESIS U MELBOURNE M
[4]  
GHOSHAL I, 1997, REPORT U ALBERTAS IN
[5]  
GHOSHAL I, 1997, THESIS U ALBERTA EDM
[6]   Factors affecting the bidding behaviour of contractors in Egypt [J].
Hassanein, AAG .
BUILDING RESEARCH AND INFORMATION, 1996, 24 (04) :228-236
[7]  
Hegazy T., 1995, Cost Engineering-Morgantown, V37, P27
[8]  
Shash A.A., 1992, CONSTRUCTION MANAGEM, V10, P415, DOI DOI 10.1080/01446199200000039
[9]  
Shash A.A., 1993, CONSTR MANAG ECON, V11, P111, DOI DOI 10.1080/01446199300000004
[10]  
1997, HEAVY CONSTRUCTI JUN, P13