Considerations for Generation in an Islanded Operation

被引:14
作者
Hamilton, E. Roy [1 ]
Undrill, John
Hamer, Paul S. [2 ]
Manson, Scott [3 ]
机构
[1] Chevron Energy Technol Co, Houston, TX 77002 USA
[2] Chevron Energy Technol Co, Richmond, CA 94802 USA
[3] Schweitzer Engn Labs Inc, Pullman, WA 99163 USA
关键词
Dynamic stability; incremental reserve margin (IRM); islanded power generation; load shedding; model validation; single-shaft gas turbine; spinning reserve; transient stability;
D O I
10.1109/TIA.2010.2070481
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper discusses the conceptual design and operation of an isolated power system, recognizing the reality that generator or turbine trips will occur. The level of reserve generating capacity must be set with proper balancing of capital expenditures and operating costs against revenue lost in a production shutdown. The way that reserve capacity is provided is as important as the amount of reserve; seemingly adequate reserve can turn out to be badly insufficient if it is not well distributed across the available reserve sources. The dynamic behavior of reserve capacity, as much as the amount of capacity that is ultimately available, is critical in determining how an isolated facility will behave in the wake of a unit trip or the loss of a grid connection. In this paper, experiences with detailed dynamic simulations of a range of isolated systems are described. These are related to test work and operational incidents that have provided practical calibrations. Based on simulation and experience, some guidelines are offered for configuring generation and selecting strategies for maintaining stability in large, isolated continuous-process facilities.
引用
收藏
页码:2289 / 2298
页数:10
相关论文
共 5 条
[1]  
ALLEN W, 2005, P 32 ANN W PROT REL, P2
[2]  
CHO B, 2008, P 35 ANN W PROT REL, P8
[3]  
Miller D., 2009, Proceedings, 2009 California Alfalfa Forage Symposium and Western Seed Conference, Reno, P1
[4]  
SCHWEITZER EO, 2008, P 35 ANN W PROT REL, P3
[5]  
SHAH S, 2006, P 16 ANN JOINT ISA P, P3