Rapid development of coalmine bolting in China

被引:17
作者
Zhang Nong [1 ]
Wang Cheng [1 ]
Zhao Yi-ming [1 ]
机构
[1] China Univ Min & Technol, Sch Mines, State Key Lab Coal Resources & Mine Safety, Xuzhou 221008, Jiangsu, Peoples R China
来源
PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MINING SCIENCE & TECHNOLOGY (ICMST2009) | 2009年 / 1卷 / 01期
关键词
bolting; high strength; high pretension force; high system stiffness; retained roadway;
D O I
10.1016/j.proeps.2009.09.009
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
Despite a slow beginning, coalmine bolting in China has got a rapid development in the past twenty years for pressing demand of deep mining, which has provided a sound technical support for safe and efficient coal production. In terms of technical characteristics, this process can be divided into three stages: "one-high" stage (high strength bolting), "two-high" stage (high strength and high pretension force bolting) and "three-high" stage (combination of high strength, high pretension force and high system stiffness bolting). Studies show that rational match of the "three-high" is safeguard to deal with the increasingly complicated deep mining situation. A whole set of strengthening bolting technology based on the "three-high" is put forward. The feasibility of its application under the most support-challenging condition-retained roadways is well tested by a typical engineering case.
引用
收藏
页码:41 / 46
页数:6
相关论文
共 9 条
[1]  
HOU CJ, 1999, MINING SCI TECHNOLOY, V19, P447
[2]  
LAUTSCH T, 19 INT C GROUND CONT
[3]  
Qian M-G., 2003, J CHINA U MINING TEC, V32, P343, DOI [10.3321/j.issn:1000-1964.2003.04.001, DOI 10.3321/J.ISSN:1000-1964.2003.04.001]
[4]  
QIAN MG, 2003, GROUND PRESSURE ITS
[5]  
Sun H, 1993, THEORY PRACTICE RETA
[6]  
SUN ZH, 2000, J SHANDONG U SCI TEC, V6
[7]  
WAN C, 1999, MINING SCI TECHNOLOY, P451
[8]  
YUAN L, 2004, CONTROL THEORY SURRO
[9]  
Zhang N, 2006, J MINING SAFETY ENG, V23, P34