Calculation of the minimum ecological water requirement of an urban river system and its deployment: A case study in Beijing central region

被引:35
作者
Jia, Haifeng [1 ]
Ma, Hongtao [1 ,2 ]
Wei, Mingjie [2 ]
机构
[1] Tsinghua Univ, Sch Environm, Beijing 100084, Peoples R China
[2] Beijing Municipal Planning & Design Inst, Beijing 100045, Peoples R China
关键词
Beijing central region; Deployment; Envelope curve; Minimum ecological water requirement; Urban river system; Reclaimed water; Wastewater treatment plants;
D O I
10.1016/j.ecolmodel.2011.05.026
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
The minimum ecological water requirements of an urban river system and water deployment are key elements in integrated water resources planning and urban ecological construction. Based on a review of ecological water requirement calculation methods and considering the different ecological functions of an urban river system, the ecological function method was used in this paper to calculate the components of the ecological water requirements of an urban river. An envelope curve-based method was proposed for assessing the minimum ecological water requirements of an urban river system. Water resources deployment strategies designed to meet the minimum ecological water requirements were described. Then, the minimum ecological water requirements of the urban river system in Beijing central region, selected as a case study, were investigated. The key parameters for assessing the minimum ecological water requirement in the Beijing urban river system were determined. Based on the ecological objectives and the current status of the different urban river systems within the Beijing central region, the minimum ecological water requirements were calculated. Different types of water sources, including rainwater, upstream water, and reclaimed water, were deployed to meet the ecological water requirements for the urban river system in the Beijing central region. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:3271 / 3276
页数:6
相关论文
共 35 条
[1]  
[Anonymous], 1976, INSTREAM FLOW NEEDS
[2]  
*BEIJ MUN GOV, 2005, BEIJ CIT MAST PLAN 2
[3]  
Beijing Municipal Bureau of Statistics, 2000, BEIJ STAT YB 1999
[4]  
Beijing Municipal Bureau of Statistics, 1999, BEIJ STAT YB 1998
[5]  
Beijing Municipal Bureau of Statistics, 2001, BEIJ STAT YB 2000
[6]  
Beijing Municipal Bureau of Statistics, 1998, BEIJ STAT YB 1997
[7]  
[车伍 Che Wu], 2004, [中国给水排水, China Water & Wastewater], V20, P56
[8]   Integrated Planning Framework for Urban River Rehabilitation [J].
Deason, Jonathan P. ;
Dickey, G. Edward ;
Kinnell, Jason C. ;
Shabman, Leonard A. .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2010, 136 (06) :688-696
[9]  
DONG Xin, 2008, Huanjing Kexue, V29, P607
[10]   Minimum ecological water depth of a typical stream in Taihu Lake Basin, China [J].
Gao, Junfeng ;
Gao, Yongnian ;
Zhao, Guangju ;
Hoermann, Georg .
QUATERNARY INTERNATIONAL, 2010, 226 (1-2) :136-142