A Top Pilot Tunnel Preconditioning Method for the Prevention of Extremely Intense Rockbursts in Deep Tunnels Excavated by TBMs

被引:117
作者
Zhang, Chuanqing [1 ]
Feng, Xiating [1 ]
Zhou, Hui [1 ]
Qiu, Shili [1 ]
Wu, Wenping [1 ]
机构
[1] Chinese Acad Sci, Inst Rock & Soil Mech, State Key Lab Geomech & Geotech Engn, Wuhan 430071, Peoples R China
基金
美国国家科学基金会;
关键词
TBM; Rockburst; Top pilot tunnel; FAI; ERR; ESS; ROCK MECHANICS; FAILURE; STRESS; INDEX;
D O I
10.1007/s00603-011-0199-5
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
The headrace tunnels at the Jinping II Hydropower Station cross the Jinping Mountain with a maximum overburden depth of 2,525 m, where 80% of the strata along the tunnels consist of marble. A number of extremely intense rockbursts occurred during the excavation of the auxiliary tunnels and the drainage tunnel. In particular, a tunnel boring machine (TBM) was destroyed by an extremely intense rockburst in a 7.2-m-diameter drainage tunnel. Two of the four subsequent 12.4-m-diameter headrace tunnels will be excavated with larger size TBMs, where a high risk of extremely intense rockbursts exists. Herein, a top pilot tunnel preconditioning method is proposed to minimize this risk, in which a drilling and blasting method is first recommended for the top pilot tunnel excavation and support, and then the TBM excavation of the main tunnel is conducted. In order to evaluate the mechanical effectiveness of this method, numerical simulation analyses using the failure approaching index, energy release rate, and excess shear stress indices are carried out. Its construction feasibility is discussed as well. Moreover, a microseismic monitoring technique is used in the experimental tunnel section for the real-time monitoring of the microseismic activities of the rock mass in TBM excavation and for assessing the effect of the top pilot tunnel excavation in reducing the risk of rockbursts. This method is applied to two tunnel sections prone to extremely intense rockbursts and leads to a reduction in the risk of rockbursts in TBM excavation.
引用
收藏
页码:289 / 309
页数:21
相关论文
共 32 条
[1]  
Board M. P, 1994, THESIS U MINNESOTA M
[2]  
Brady B., 2006, Rock Mechanics for underground mining, V3rd, P165
[3]   EXPERIENCES FROM THE PLANNING, CONSTRUCTION AND SUPPORTING OF A ROAD TUNNEL SUBJECTED TO HEAVY ROCKBURSTING [J].
BROCH, E ;
SORHEIM, S .
ROCK MECHANICS AND ROCK ENGINEERING, 1984, 17 (01) :15-35
[4]  
Brown E. T., 1984, TUNNELS TUNNELL, V84, P17
[5]  
Canadian Rockburst Research Program CRRP, 1996, COMPR SUMM 5 YEARS C
[6]  
Goodman R.E., 1980, Introduction to rock mechanics
[7]   Modelling brittle failure of rock [J].
Hajiabdolmajid, V ;
Kaiser, PK ;
Martin, CD .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2002, 39 (06) :731-741
[8]  
HILL FG, 1966, J S AFR I MIN METALL, V66, P435
[9]  
HOEK E, 1997, SUPPORT UNDERGROUND
[10]   A review of mining-induced seismicity in China [J].
Li, T. ;
Cai, M. F. ;
Cai, M. .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2007, 44 (08) :1149-1171