A two-stage fuzzy robust integer programming approach for capacity planning of environmental management systems

被引:56
作者
Li, Y. P. [1 ,2 ]
Huang, G. H. [1 ,3 ]
Nie, X. H. [1 ]
Nie, S. L. [4 ]
机构
[1] Univ Regina, Fac Engn, Environm Syst Engn Program, Regina, SK S4S 0A2, Canada
[2] Dalhousie Univ, Dept Civil & Resource Engn, Halifax, NS B3J 1Z1, Canada
[3] Chinese Res Inst Environm Sci, Beijing 100012, Peoples R China
[4] Huazhong Univ Sci & Technol, Sch Mech Sci & Engn, Wuhan 430074, Peoples R China
关键词
decision-making; environment; integer programming; robust programming; two-stage stochastic; uncertainty;
D O I
10.1016/j.ejor.2007.05.014
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this study, a two-stage fuzzy robust integer programming (TFRIP) method has been developed for planning environmental management systems under uncertainty. This approach integrates techniques of robust programming and two-stage stochastic programming within a mixed integer linear programming framework. It can facilitate dynamic analysis of capacity-expansion planning for waste management facilities within a multi-stage context. In the modeling formulation, uncertainties can be presented in terms of both possibilistic and probabilistic distributions, such that robustness of the optimization process could be enhanced. In its solution process, the fuzzy decision space is delimited into a more robust one by specifying the uncertainties through dimensional enlargement of the original fuzzy constraints. The TFRIP method is applied to a case study of long-term waste-management planning under uncertainty. The generated solutions for continuous and binary variables can provide desired waste-flow-allocation and capacity-expansion plans with a minimized system cost and a maximized system feasibility. (C) 2007 Published by Elsevier B.V.
引用
收藏
页码:399 / 420
页数:22
相关论文
共 55 条
[1]   A finite branch-and-bound algorithm for two-stage stochastic integer programs [J].
Ahmed, S ;
Tawarmalani, M ;
Sahinidis, NV .
MATHEMATICAL PROGRAMMING, 2004, 100 (02) :355-377
[2]   Robust process planning under uncertainty [J].
Ahmed, S ;
Sahinidis, NV .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (05) :1883-1892
[3]   CAPACITY PLANNING FOR WASTE MANAGEMENT-SYSTEMS [J].
BAETZ, BW .
CIVIL ENGINEERING SYSTEMS, 1990, 7 (04) :229-235
[4]   Making a case for robust optimization models [J].
Bai, DW ;
Carpenter, T ;
Mulvey, J .
MANAGEMENT SCIENCE, 1997, 43 (07) :895-907
[5]   Robust optimization - methodology and applications [J].
Ben-Tal, A ;
Nemirovski, A .
MATHEMATICAL PROGRAMMING, 2002, 92 (03) :453-480
[6]   Robust solutions of uncertain linear programs [J].
Ben-Tal, A ;
Nemirovski, A .
OPERATIONS RESEARCH LETTERS, 1999, 25 (01) :1-13
[7]  
Ben-Tal A., 2000, HDB SEMIDEFINITE PRO
[8]  
BENTAL A, 1998, MATH OPER RES, P23
[9]  
Birge J.R., 1997, INTRO STOCHASTIC PRO
[10]   A MULTICUT ALGORITHM FOR 2-STAGE STOCHASTIC LINEAR-PROGRAMS [J].
BIRGE, JR ;
LOUVEAUX, FV .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1988, 34 (03) :384-392