New Ideas for a Soft Synchronizer Applied to CHP Cogeneration

被引:15
作者
Cho, Changhee [1 ]
Kim, Seul-Ki [1 ]
Jeon, Jin-Hong [1 ]
Kim, Sungshin [2 ]
机构
[1] Korea Electrotechnol Res Inst, New & Renewable Energy Syst Res Ctr, Chang Won 642120, South Korea
[2] Pusan Natl Univ, Sch Elect & Comp Engn, Pusan 609735, South Korea
关键词
Combined heat and power (CHP); cogeneration; microgrids; phase measurement; reference frame transformation; synchronization; synchronizer; POWER; FREQUENCY;
D O I
10.1109/TPWRD.2010.2080692
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper provides new ideas for the synchronization between an electric power system and a synchronous generator. If an individual ac generator is to be operated with another ac power system, the synchronization is an essential process for the parallel operation. For small combined heat and power cogeneration, the synchronization is a very frequent event and one of the most important jobs in daily operation. There are several types of traditional devices that support or control the breaker closure within the synchronizing criteria. However, the actual break closing is not controlled exactly on a zero point phase-angle difference. In this paper, we introduce new ideas that will lead two ac systems to a smooth and soft synchronization. With these ideas, a soft synchronizer that provides the perfect phase-angle matching is realized. To verify the effectiveness of this newly proposed soft synchronizer, we had conducted simulation studies using MATLAB as well as experimental tests with an actual synchronous diesel generator.
引用
收藏
页码:11 / 21
页数:11
相关论文
共 20 条
[1]  
[Anonymous], MATLAB SIMPOWERSYSTE
[2]   FREQUENCY TRACKING IN POWER NETWORKS IN THE PRESENCE OF HARMONICS [J].
BEGOVIC, MM ;
DJURIC, PM ;
DUNLAP, S ;
PHADKE, AG .
IEEE TRANSACTIONS ON POWER DELIVERY, 1993, 8 (02) :480-486
[3]  
Benmouyal G, 2004, ANN CONF PROTECT REL, P419
[4]   A MANUAL AUTOMATIC SYNCHRONIZATION CIRCUIT FOR A 37.5-MVA STEAM-TURBINE-DRIVEN GENERATOR [J].
EVANS, RA .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 1990, 26 (06) :1081-1085
[5]  
Gross L. C., 1997, P 24 ANN W PROT REL, P1
[6]   Generator black start validation using synchronized phasor measurement [J].
Koellner, Kris ;
Anderson, Chris ;
Moxey, Roy .
2006 IEEE/PES Power Systems Conference and Exposition. Vols 1-5, 2006, :1356-1362
[7]  
Lasseter R.H., 2008, Power and Energy Society General Meeting-Conversion and Delivery of Electrical Energy in the 21st Century, 2008 IEEE, P1
[8]  
Lasseter RH, 2002, 2002 IEEE POWER ENGINEERING SOCIETY WINTER MEETING, VOLS 1 AND 2, CONFERENCE PROCEEDINGS, P305, DOI 10.1109/PESW.2002.985003
[9]   Optimal technology selection and operation of commercial-building microgrids [J].
Marnay, Chris ;
Venkataramanan, Giri ;
Stadler, Michael ;
Siddiqui, Afzal S. ;
Firestone, Ryan ;
Chandran, Bala .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2008, 23 (03) :975-982
[10]   Policymaking for microgrids [J].
Marnay, Chris ;
Asano, Hiroshi ;
Papathanassiou, Stavros ;
Strbac, Goran .
IEEE POWER & ENERGY MAGAZINE, 2008, 6 (03) :66-77