A capacity allocation problem with integer side constraints

被引:42
作者
Toktay, LB [1 ]
Uzsoy, R [1 ]
机构
[1] Purdue Univ, Sch Ind Engn, W Lafayette, IN 47907 USA
关键词
scheduling; network flows; semiconductor manufacturing;
D O I
10.1016/S0377-2217(98)80011-8
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We address a capacity allocation problem arising as a subproblem of an artificial intelligence-based scheduling system for a semiconductor wafer fabrication facility. Tooling constraints, setup considerations and differences in machine capabilities are taken into account. Focusing on the objectives of maximizing throughput and minimizing deviation from predetermined production goals, we formulate the problem as a maximum flow problem on a bipartite network with integer side constraints and develop efficient heuristics which obtain near-optimal solutions in negligible computation time. The type of network flow problem we study has not been addressed in the literature to date and is of considerable theoretical interest. From a practical point of view, the network flow model of the problem and the algorithms developed for its solution are applicable to a wide range of production settings. (C) 1998 Elsevier Science B.V.
引用
收藏
页码:170 / 182
页数:13
相关论文
共 14 条
[1]   A FACET GENERATION AND RELAXATION TECHNIQUE APPLIED TO AN ASSIGNMENT PROBLEM WITH SIDE CONSTRAINTS [J].
ABOUDI, R ;
HALLEFJORD, A ;
JORNSTEN, K .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 50 (03) :335-344
[2]  
Ahuja RK., 1993, NETWORK FLOWS THEORY
[3]  
BAI X, 1990, P 9 IEEE INT EL MAN
[4]  
CPLEX Optimization Inc, 1993, US CPLEX CALL LIB CP
[5]  
ELLEBY P, 1989, KNOWLEDGE BASED PROD
[6]   CLOSED-LOOP JOB RELEASE CONTROL FOR VLSI CIRCUIT MANUFACTURING [J].
GLASSEY, CR ;
RESENDE, MGC .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1988, 1 (01) :36-46
[7]  
GRAVES SC, 1983, J OPERATIONS MANAGEM, V3, P197, DOI DOI 10.1016/0272-6963(83)90004-9
[8]  
Kempf K.G., 1994, INTELLIGENT SCHEDULI
[9]   EFFICIENT SCHEDULING POLICIES TO REDUCE MEAN AND VARIANCE OF CYCLE-TIME IN SEMICONDUCTOR MANUFACTURING PLANTS [J].
LU, SCH ;
RAMASWAMY, D ;
KUMAR, PR .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 1994, 7 (03) :374-388