Field demonstration of a 24-kV warm dielectric HTS cable

被引:19
作者
Kelley, NJ [1 ]
Wakefield, C
Nassi, M
Corsaro, P
Spreafico, S
Von Dollen, DW
Jipping, J
机构
[1] Pirelli Cables & Syst N Amer, Lexington, SC 29072 USA
[2] Pirelli Cavi & Sistemi, I-20126 Milan, Italy
[3] DTE Energy, Detroit, MI USA
[4] EPRI, Palo Alto, CA 94303 USA
关键词
power cables; Bi-2223; tape; critical current; high-temperature superconductors;
D O I
10.1109/77.920361
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Prototype HTS cable systems have been installed in laboratories and tested successfully around the world, proving the technical feasibility of the HTS cable system. Commercial cable systems, however, must not only be feasible, hut meet practical requirements as well. To facilitate the transition of HTS cable technology from the laboratory to the field, a project has been initiated to install the world's first HTS power cable to deliver electricity in a utility network. This program will demonstrate a retrofit upgrade application of the Warm Dielectric HTS cable design in the Detroit Edison utility network, and involve the design, engineering, installation, test and routine operation of a 24-kV, 100 MVA, 3-phase cable system. Each HTS cable will carry 2400ARMS, a level triples the ampacity of original cables powering this circuit. This paper addresses the field application of HTS cables in the contest of the demonstration program. Customer perception will play a crucial role ill the adoption of HTS cable systems by the utility industry. An updated perspective provided by the utility industry team members is included.
引用
收藏
页码:2461 / 2466
页数:6
相关论文
共 5 条
[1]  
HERMANN V, 1999, JICABLE 1999
[2]  
KELLEY N, 2000, P AICHE SPRING M ATL
[3]  
MASUR L, 2000, APPL SUP C VIRG BEAC
[4]  
WILLEN DWA, 2000, APPL SUP C VIRG BEAC
[5]   Superconducting transmission cables [J].
Willis, Jeffrey O. .
IEEE Power Engineering Review, 2000, 20 (08) :10-14