Risk ownership in contract manufacturing

被引:38
作者
Ulku, Sezer [1 ]
Toktay, L. Beril
Yucesan, Enver
机构
[1] Georgetown Univ, McDonough Sch Business, Washington, DC 20057 USA
[2] Georgia Inst Technol, Coll Management, Atlanta, GA 30308 USA
[3] INSEAD, F-77305 Fontainebleau, France
关键词
information asymmetry; risk ownership; contract manufacturing; resource pooling;
D O I
10.1287/msom.1060.0141
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a supply chain where a contract manufacturer (CM) serves a number of original equipment manufacturers (OEMs). Investment into productive resources is made before demand realization, hence the supply chain faces the risk of under- or overinvestment. The CM and OEMs differ in their forecast accuracy and in their resource pooling capabilities, leading to a disparity in their ability to minimize costs due to demand uncertainty. We consider two scenarios in which this risk is borne by the OEM and CM, respectively. We determine which party should bear the risk so that maximum supply chain profits are achieved. We investigate the effectiveness of premium-based schemes in inducing the best party to bear the risk, and conclude that they function well despite information asymmetry when double marginalization is not very high.
引用
收藏
页码:225 / 241
页数:17
相关论文
共 42 条
[1]   Risk intermediation in supply chains [J].
Agrawal, V ;
Seshadri, S .
IIE TRANSACTIONS, 2000, 32 (09) :819-831
[2]   Information and organization for horizontal multimarket coordination [J].
Anand, KS ;
Mendelson, H .
MANAGEMENT SCIENCE, 1997, 43 (12) :1609-1627
[3]  
BROWN A, 2003, COMMUNICATION 0519
[4]  
BROWN A, 1999, COORDINATING SUPPLY
[5]   Capacity choice and allocation: Strategic behavior and supply chain performance [J].
Cachon, GP ;
Lariviere, MA .
MANAGEMENT SCIENCE, 1999, 45 (08) :1091-1108
[6]   Contracting to assure supply: How to share demand forecasts in a supply chain [J].
Cachon, GP ;
Lariviere, MA .
MANAGEMENT SCIENCE, 2001, 47 (05) :629-646
[7]   Supply chain inventory management and the value of shared information [J].
Cachon, GP ;
Fisher, M .
MANAGEMENT SCIENCE, 2000, 46 (08) :1032-1048
[8]   The allocation of inventory risk in a supply chain: Push, pull, and advance-purchase discount contracts [J].
Cachon, GP .
MANAGEMENT SCIENCE, 2004, 50 (02) :222-238
[9]  
Chen F., 2000, MEAN VARIANCE ANAL B
[10]   Echelon reorder points, installation reorder points, and the value of centralized demand information [J].
Chen, FR .
MANAGEMENT SCIENCE, 1998, 44 (12) :S221-S234