共 12 条
[1]
RISK-EVALUATION IN RESOURCE-ALLOCATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1984, 110 (03)
:324-336
[2]
Baker J. E., 1985, Proceedings of the International Conference on Genetic Algorithms and their Applications, P101
[3]
CHAN WT, 1996, J CONSTRUCTION ENG M
[4]
RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1989, 115 (02)
:302-316
[5]
Goldberg DE, 1989, GENETIC ALGORITHMS S
[6]
GREFENSTETTE JJ, 1983, USERS GUIDE GENESIS
[7]
RESOURCE-MANAGEMENT IN CONSTRUCTION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1986, 112 (03)
:346-357
[8]
LEE I, 1993, PROCEEDINGS OF THE FIFTH INTERNATIONAL CONFERENCE ON GENETIC ALGORITHMS, P383
[9]
Moder J.J., 1983, Project Management with CPM, PERT and Precedence Diagramming
[10]
TIME-CONSTRAINED RESOURCE LEVELING
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1991, 117 (03)
:503-520