Inventory management with variable lead-time dependent procurement cost

被引:50
作者
Chandra, Charu [1 ]
Grabis, Janis [2 ]
机构
[1] Univ Michigan, Dept Ind & Mfg Syst Engn, Dearborn, MI 48128 USA
[2] Riga Tech Univ, LV-1658 Riga, Latvia
来源
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE | 2008年 / 36卷 / 05期
关键词
inventory control; variable lead-time; sensitivity analysis;
D O I
10.1016/j.omega.2006.04.009
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
A reduction in the inventory replenishment lead-time allows reducing safety stock requirements and improving customer service. However, it might be accompanied by increased procurement costs because of premium charges imposed by suppliers, or higher transportation costs. This paper studies a single-stage variable lead-time inventory system with lead-time dependent procurement cost. Selection of the lead-time value represents finding the trade-off between benefits of lead-time reduction and increase in the procurement cost. A model for joint optimization of inventory and procurement costs is developed. Numerical studies are conducted to identify conditions under which lead-time reduction is favorable compared to procuring at the lowest cost. (C) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:877 / 887
页数:11
相关论文
共 24 条
[1]  
[Anonymous], 2000, INT J PHYS DISTRIBUT
[2]   Future capacity procurements under unknown demand and increasing costs [J].
Burnetas, A ;
Gilbert, S .
MANAGEMENT SCIENCE, 2001, 47 (07) :979-992
[3]  
Cachon G., 2002, ALLOCATION INVENTORY
[4]   Application of multi-steps forecasting for restraining the bullwhip effect and improving inventory performance under autoregressive demand [J].
Chandra, C ;
Grabis, J .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 166 (02) :337-350
[5]  
CHANDRA C, 2003, P 34 ANN DEC SCI I M, P1939
[6]   Modeling the flexibility of order quantities and lead-times in supply chains [J].
Das, SK ;
Abdel-Malek, L .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 85 (02) :171-181
[7]   On the bullwhip and inventory variance produced by an ordering policy [J].
Disney, SM ;
Towill, DR .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2003, 31 (03) :157-167
[8]   An operational decision model for lead-time and price quotation in congested manufacturing systems [J].
ElHafsi, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 126 (02) :355-370
[9]  
FERGUSON ME, 2003, NAV RES LOG, V50, P1
[10]   Supply chain benefits from advanced customer commitments [J].
Gilbert, SM ;
Ballou, RH .
JOURNAL OF OPERATIONS MANAGEMENT, 1999, 18 (01) :61-73