Optimal periodic scheduling of batch plants using RTN-based discrete and continuous-time formulations:: A case study approach

被引:54
作者
Castro, PM [1 ]
Barbosa-Póvoa, AP
Matos, HA
机构
[1] Univ Tecn Lisboa, Dept Engn Quim, Inst Super Tecn, P-1049001 Lisbon, Portugal
[2] INETI, Dept Modelacao & Simulacao Proc, P-1649038 Lisbon, Portugal
关键词
D O I
10.1021/ie0203781
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper considers the problem of deriving an optimal periodic schedule for an industrial batch plant. Both discrete and continuous-time formulations, based on the general resource task network process (RTN) representation, are employed. For a given cycle time, the proposed discrete-time formulation results in a mixed integer linear programming (MILP) program that can be solved to optimality in a reasonable time, even for a fine discretization of the time grid. The optimal cycle time is then determined by solving a sequence of fixed cycle time problems. On the other hand, the continuous-time formulation results in a mixed integer nonlinear (MINLP) problem that under the assumption of constant throughput becomes a MILP. This can be solved to optimality within reasonable computational effort only for a relatively small number of event points, making it practically impossible to find the global optimum. These results favor the use of the discrete-time formulation over its continuous-time counterpart.
引用
收藏
页码:3346 / 3360
页数:15
相关论文
共 18 条
[1]  
Brooke A., 1998, GAMS USERS GUIDE
[2]   Dynamic modelling and scheduling of an industrial batch system [J].
Castro, P ;
Matos, H ;
Barbosa-Póvoa, APFD .
COMPUTERS & CHEMICAL ENGINEERING, 2002, 26 (4-5) :671-686
[3]   An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants [J].
Castro, P ;
Barbosa-Póvoa, APFD ;
Matos, H .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2001, 40 (09) :2059-2068
[4]  
CASTRO P, 2001, THESIS U TECNICA LIS
[5]   Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4341-4359
[6]   Effective continuous-time formulation for short-term scheduling.: 3.: Multiple intermediate due dates [J].
Ierapetritou, MG ;
Hené, TS ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1999, 38 (09) :3446-3461
[7]   Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4360-4374
[8]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227
[9]  
MOCKUS L, 1994, AICHE ANN M SAN FRAN
[10]  
Pantelides C.C., 1994, PROC C F FDN F COMPU, P253