Before the commissioning of SPring-8, the in-vacuum hybrid undulator developed at SPring-8 had been brought to the ESRF for the first beam test in the summer of 1996. The purpose of this test was to investigate the influence of the in-vacuum undulator on the beam and check its vacuum system. However, heating by the resistive wall impedance turned out to be a critical issue for the in-vacuum undulators.
引用
收藏
页码:406 / 408
页数:3
相关论文
共 3 条
[1]
BANE K, 1993, PROCEEDINGS OF THE 1993 PARTICLE ACCELERATOR CONFERENCE, VOLS 1-5, P3375, DOI 10.1109/PAC.1993.309655