A genetic algorithm approach to a general category project scheduling problem

被引:117
作者
Özdamar, L [1 ]
机构
[1] Istanbul Kultur Univ, Dept Comp Engn, TR-80280 Istanbul, Turkey
来源
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART C-APPLICATIONS AND REVIEWS | 1999年 / 29卷 / 01期
关键词
genetic algorithms; heuristic knowledge; resource-constrained project scheduling;
D O I
10.1109/5326.740669
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
A genetic algorithm (GA) approach is proposed for the general resource constrained project scheduling model, in which activities may be executed in more than one operating mode and renewable as well as nonrenewable resource constraints exist, Each activity operation mode has a different duration and requires different amounts of renewable and nonrenewable resources. The objective is the minimization of the project duration or makespan, The problem under consideration is known to be one of the most difficult scheduling problems, and it is hard to find a feasible solution for such a problem, let alone the optimal one, The GA approach described here incorporates problem-specific scheduling knowledge by an indirect chromosome encoding that consists of selected activity operating modes and an ordered set of scheduling rules, The scheduling rules in the chromosome are used in an iterative scheduling algorithm that constructs the schedule resulting from the chromosome. The proposed GA is denoted as a hybrid GA (HGA) approach since it is integrated with traditional scheduling tools and expertise specifically developed for the general resource constrained project scheduling problem. The results demonstrate that HGA approach produces near-optimal solutions within a reasonable amount of computation time.
引用
收藏
页码:44 / 59
页数:16
相关论文
共 44 条
[1]  
ALVAREZVALDES A, 1989, ADV PROJECT SCHEDULI
[2]  
[Anonymous], 1991, HDB GENETIC ALGORITH
[3]  
[Anonymous], P 3 INT C GEN ALG SA
[4]  
[Anonymous], 1996, NO FREE LUNCH THEORE
[5]  
Bean J. C., 1994, ORSA Journal on Computing, V6, P154, DOI 10.1287/ijoc.6.2.154
[6]   GENETIC ALGORITHMS AND JOB SHOP SCHEDULING [J].
BIEGEL, JE ;
DAVERN, JJ .
COMPUTERS & INDUSTRIAL ENGINEERING, 1990, 19 (1-4) :81-91
[7]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24
[8]   HEURISTICS FOR SCHEDULING PROJECTS WITH RESOURCE RESTRICTIONS AND SEVERAL RESOURCE-DURATION MODES [J].
BOCTOR, FF .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (11) :2547-2558
[9]  
BOCTOR FF, 1994, ADAPTATION SIMULATED
[10]  
BOCTOR FF, 1994, NEW EFFICIENT HEURIS