Refinery short-term scheduling with tank farm, inventory and distillation management: An integrated simulation-based approach

被引:41
作者
Chryssolouris, G [1 ]
Papakostas, N [1 ]
Mourtzis, D [1 ]
机构
[1] Univ Patras, Dept Mech Engn & Aeronaut, Lab Mfg Syst & Automat, GR-26110 Patras, Greece
关键词
decision support systems; scheduling; simulation; pooling problem; petroleum industry;
D O I
10.1016/j.ejor.2004.03.046
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This work addresses primarily the scheduling of a refinery importing various types of crude oil. The refinery operation discussed in this paper involves the unloading of crude oil to storage tanks, the transfer and blending from storage tanks to charging tanks and crude oil distillation units, and the arrangement of the temperature cut-points for each distillation unit. The paper describes a simulation-based approach to the refinery operation, which is modelled as a pooling problem. The proposed approach uses a random-search formulation, which allows for controlling search depth, breadth and solution quality, as well as computational effort. An implementation of the proposed approach is presented in a real case scenario. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:812 / 827
页数:16
相关论文
共 18 条
[1]  
Amos F, 1997, J OPER RES SOC, V48, P767
[2]  
BALLINTIJN K, 1993, OPTIMIZATION IND, P191
[3]   A HISTORY OF MATHEMATICAL-PROGRAMMING IN THE PETROLEUM-INDUSTRY [J].
BODINGTON, CE ;
BAKER, TE .
INTERFACES, 1990, 20 (04) :117-127
[4]   ON THE RESOURCES ALLOCATION PROBLEM [J].
CHRYSSOLOURIS, G ;
DICKE, K ;
LEE, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (12) :2773-2795
[5]  
Chryssolouris G., 1992, MANUFACTURING SYSTEM
[6]  
*COL PETR CO, 1999, COL CRUD OIL PROD
[7]  
FIELDHOUSE M, 1993, OPTIMIZATION IND MAT, P223
[8]  
HIMMELLAU DM, 1992, BASIC PRINCIPLES CAL
[9]  
HOFFERL F, 1998, ERDOL ERDGAS KOHLE, V114, P244
[10]  
Hwang C. L., 1981, Lecture Notes in Economics and Mathematical Systems, V186, P58, DOI 10.1007/978-3-642-48318-9_3