摘要
The construction industry is the major solid waste generator in Hong Kong. In 1998, it generated about 32710 t per day of construction and demolition (C&D) waste. In the management of such a huge quantity of C&D waste, Hong Kong has adopted a strategy of depositing the inert portion (e.g, sand, bricks and concrete) of the waste at public filling areas for land reclamation and the non-inert portion (e.g. plastics, paper, wood) at municipal solid waste landfills. However, the C&D waste arisen is usually in the form of a mixture of both inert and non-inert materials. As a result, the waste has to be disposed of at landfills, aggravating the landfill shortage problem. There is a paramount need to separate the C&D waste into its constituent parts before it is delivered to either the landfills or the public filling areas for disposal. In order to study the feasibility of carrying out on-site waste sorting and the current situation of the building relating C&D waste generated in Hong Kong, a survey was conducted. This paper presents the results of the survey undertaken to evaluate three alternative waste sorting methods on building construction sites and to compare them with the use of an off-site central waste sorting facility. The results indicate source separation has the advantages of requiring less effort and resulting in better segregation of inert and non-inert wastes as compared with waste sorting centrally carried out at a designated area on- or off-site. In addition, the views of the building industry participants were also obtained through a questionnaire survey to give a better understanding of their attitude on on-site waste sorting. The results indicate that the building construction participants are reluctant to carry out on-site waste sorting. Even when high a tipping fee is imposed, they have little incentive to perform on-site waste sorting which is considered to be time and labour demanding. Only through contractual requirements or legislation can on-site waste sorting be fully implemented and becomes a long-term solution to the landfill shortage problem in Hong Kong. (C) 2001 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:157 / 172
页数:16
相关论文
共 11 条
  • [1] [Anonymous], 1992, INT SOLID WASTE MANA
  • [2] *BUILD DEP, 1998, DRAFT COD PRACT DEM
  • [3] CHEUNG CM, 1993, REDUCTION CONSTRUCTI
  • [4] CHUNG JKO, 2000, MONITORING SOLID WAS
  • [5] *CIV ENG DEP, 1998, FIN REP REV PUBL FIL
  • [6] *CONSTR IND RES IN, 1995, CIRIA SPEC PUBL, V122
  • [7] *ENV PROT DEP, 1991, STUD REC CONSTR WAST
  • [8] *ENV PROT DEP, WAST RED FRAM PLAN 1
  • [9] *ENV PROT DEP, 2000, ENV HONG KONG REV 19
  • [10] Management and recycling of demolition waste in Hong Kong
    Poon, CS
    [J]. WASTE MANAGEMENT & RESEARCH, 1997, 15 (06) : 561 - 572