共 30 条
[1]
Ahuja H, 1984, PROJECT MANAGEMENT T
[2]
Al-Tabtabai H., 1999, Eng. Constr. Archit. Manag., V6, P121, DOI [DOI 10.1108/EB021105, 10.1046/j.1365-232x.1999.00086.x, DOI 10.1046/J.1365-232X.1999.00086.X]
[3]
ALBANESE GR, 1991, J CONSTR ENG MANAGE, V7, P59
[4]
Allam S. I., 1988, CONSTRUCTION MANAGEM, V6, P93, DOI [10.1080/01446198800000010, DOI 10.1080/01446198800000010]
[5]
[Anonymous], 1989, GENETIC ALGORITHM SE
[6]
Burleson R. C., 1997, THESIS U TEXAS AUSTI
[7]
Construction resource scheduling with genetic algorithms
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1996, 122 (02)
:125-132
[8]
Clough RH., 2000, CONSTRUCTION PROJECT
[9]
COMPARISON OF HEURISTIC AND OPTIMUM SOLUTIONS IN RESOURCE-CONSTRAINED PROJECT SCHEDULING
[J].
MANAGEMENT SCIENCE SERIES B-APPLICATION,
1975, 21 (08)
:944-955
[10]
RESOURCE LEVELING IN CONSTRUCTION BY OPTIMIZATION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1989, 115 (02)
:302-316