Refinery short-term scheduling using continuous time formulation: Crude-oil operations

被引:151
作者
Jia, ZY
Ierapetritou, M [1 ]
Kelly, JD
机构
[1] Rutgers State Univ, Dept Chem & Biochem Engn, Piscataway, NJ 08854 USA
[2] Honeywell Hispec Solut, Toronto, ON M2J 1S1, Canada
关键词
D O I
10.1021/ie020124f
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
This paper addresses the problem of crude-oil short-term scheduling, which is the first part of the overall refining operations. The problem involves the optimal operation of crude-oil unloading from vessels, its transfer to storage tanks, and the charging schedule for each crude-oil mixture to the distillation units. A novel model is developed based on a continuous-time representation and results in a mixed-integer linear programming (MILP) problem. The state-task network representation is used throughout this paper. The proposed formulation is applied to several case studies and leads to fewer binary and continuous variables and fewer constraints compared with existing discrete-time models. Thus, an efficient solution can be achieved using available MILP solvers.
引用
收藏
页码:3085 / 3097
页数:13
相关论文
共 14 条
[1]  
BODINGTON CE, 1995, PLANNING SCHEDULING
[2]   Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4341-4359
[3]   Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4360-4374
[4]   Structured approach to storage allocation for improved process controllability [J].
Kelly, JD ;
Forbes, JF .
AICHE JOURNAL, 1998, 44 (08) :1832-1840
[5]   A GENERAL ALGORITHM FOR SHORT-TERM SCHEDULING OF BATCH-OPERATIONS .1. MILP FORMULATION [J].
KONDILI, E ;
PANTELIDES, CC ;
SARGENT, RWH .
COMPUTERS & CHEMICAL ENGINEERING, 1993, 17 (02) :211-227
[6]   Mixed-integer linear programming model for refinery short-term scheduling of crude oil unloading with inventory management [J].
Lee, HM ;
Pinto, JM ;
Grossmann, IE ;
Park, S .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1996, 35 (05) :1630-1641
[7]   A planning model for refinery diesel production [J].
Moro, LFL ;
Zanin, AC ;
Pinto, JM .
COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 :S1039-S1042
[8]   Planning and scheduling models for refinery operations [J].
Pinto, JM ;
Joly, M ;
Moro, LFL .
COMPUTERS & CHEMICAL ENGINEERING, 2000, 24 (9-10) :2259-2276
[9]   OPTIMAL CYCLIC SCHEDULING OF MULTISTAGE CONTINUOUS MULTIPRODUCT PLANTS [J].
PINTO, JM ;
GROSSMANN, IE .
COMPUTERS & CHEMICAL ENGINEERING, 1994, 18 (09) :797-816
[10]   Assignment and sequencing models for thescheduling of process systems [J].
Jose M. Pinto ;
Ignacio E. Grossmann .
Annals of Operations Research, 1998, 81 (0) :433-466