共 36 条
[1]
Scheduling cost optimization and neural dynamics model for construction
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1997, 123 (04)
:450-458
[2]
Anderson A., 2001, 451 NCHRP
[3]
[Anonymous], 1985, DESIGN PLANNING ENG
[4]
[Anonymous], 1989, GENETIC ALGORITHM SE
[5]
[Anonymous], 2001, SPEA2 IMPROVING STRE
[6]
[Anonymous], 2003, C39C39M01 ASTM
[7]
*ASTM, 2003, E192798 ASTM
[8]
Burns SA., 1996, CONSTR MANAGE EC, V14, P265, DOI [DOI 10.1080/014461996373511, 10.1080/014461996373511]
[9]
Construction resource scheduling with genetic algorithms
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1996, 122 (02)
:125-132
[10]
DEB K, 2001, 200001 KANGAL GEN AL