Six years of pilot plant studies for design of treatment plants for nutrient removal

被引:11
作者
Harremoes, P [1 ]
Haarbo, A
Winther-Nielsen, M
Thirsing, C
机构
[1] Tech Univ Denmark, Dept Environm Sci & Engn, DK-2800 Lyngby, Denmark
[2] Kruger AS, DK-2860 Soborg, Denmark
[3] Water Qual Inst, DK-2970 Horsholm, Denmark
[4] Lynettefoellesskabet, DK-1472 Copenhagen K, Denmark
关键词
biological treatment; denitrification; domestic wastewater; inhibition; nitrification; temperature effects;
D O I
10.2166/wst.1998.0053
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The decision to upgrade the treatment plants of the City of Copenhagen to include nutrient removal was made in 1989. At the same time, it was decided that intensive pilot plant studies should be initiated in combination with wastewater characterisation. The pilot plant studies were designed to suit kinetic interpretation of plant performances including wide variations of operation to identify the process limitations. It soon became apparent that the limiting factors with respect to nitrogen removal were temperature, rate of nitrification and the availability of sufficient carbon and energy sources for denitrification. The study included a literature survey to identify a reference growth rate of nitrifiers, study of temperature conditions of future plant operation during winter periods, nitrification rates in the pilot plant under temperature control and identification of nitrification inhibition, plus analysis of carbon and energy sources for denitrification. The result was that the inhibition was significant, and several performance break-downs were experienced from 1989 to 1991. Intensive programmes have identified inhibition from industrial regions in the city and internal recycles in the treatment plant. The inhibition has been reduced considerably over a six-year-period. (C) 1998 Published by Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:219 / 226
页数:8
相关论文
共 12 条
[1]  
ARVIN E, 1994, MINNTOX WAT RES, V9, P2029
[2]  
*DAN MIN ENV, 1987, ACT PLAN POLL DAN MA
[3]  
GRUTTNER H, 1994, WATER SCI TECHNOL, V29, P69
[4]   NORTHERN EUROPE LARGEST WASTE-WATER TREATMENT-PLANT IN COPENHAGEN UPGRADED TO NUTRIENT REMOVAL [J].
HANSEN, JL ;
NIELSEN, PS .
WATER SCIENCE AND TECHNOLOGY, 1992, 25 (4-5) :339-346
[5]   KINETIC INTERPRETATION OF NITROGEN REMOVAL IN PILOT-SCALE EXPERIMENTS [J].
HARREMOES, P ;
SINKJAER, O .
WATER RESEARCH, 1995, 29 (03) :899-905
[6]  
HARREMOES P, 1992, J IWEM, V6, P50
[7]  
HARREMOES P, 1991, J EUROPEAN WATER POL, V1, P19
[8]  
Henze M., 1995, WASTEWATER TREATMENT
[9]  
HENZE M, 1988, INT WORKSH WAST TREA
[10]  
*ISO, 1989, 9509 ISO