Coordinated scheduling of customer orders for quick response

被引:58
作者
Ahmadi, R [1 ]
Bagchi, U
Roemer, TA
机构
[1] Univ Calif Los Angeles, Anderson Sch Management, Los Angeles, CA 90095 USA
[2] Univ Texas, Dept Management, Austin, TX 78712 USA
[3] MIT, Alfred P Sloan Sch Management, Cambridge, MA 02142 USA
关键词
sequencing; customer orders; algorithms and complexity; bounding procedure;
D O I
10.1002/nav.20092
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The scheduling problem addressed in this paper concerns a manufacturer who produces a variety of product types and operates in a make-to-order environment. Each customer order consists of known quantities of the different product types, and must be delivered as a single shipment. Periodically the manufacturer schedules the accumulated and unscheduled customer orders. Instances of this problem occur across industries in manufacturing as well as in service environments. In this paper we show that the problem of minimizing the weighted sum of customer order delivery times is unary NP-hard. We characterize the optimal schedule. solve several special cases of the problem, derive tight lower bounds, and propose several heuristic solutions. We report the results of a set of computational experiments to evaluate the lower bounding procedures and the heuristics, and to determine optimal solutions. (c) 2005 Wiley Periodicals, Inc.
引用
收藏
页码:493 / 512
页数:20
相关论文
共 29 条
[1]   MINIMIZING JOB IDLENESS IN DEADLINE CONSTRAINED ENVIRONMENTS [J].
AHMADI, RH ;
BAGCHI, U .
OPERATIONS RESEARCH, 1992, 40 (05) :972-985
[2]  
AHMADI RH, 1990, SCHEDULING MULTI JOB
[3]  
AHMADI RH, 1993, COORDINATED SCHEDULI
[4]   SCHEDULING IDENTICAL PARALLEL MACHINES TO MINIMIZE TOTAL WEIGHTED COMPLETION-TIME [J].
BELOUADAH, H ;
POTTS, CN .
DISCRETE APPLIED MATHEMATICS, 1994, 48 (03) :201-218
[5]  
Blocher JD, 1996, NAV RES LOG, V43, P629, DOI 10.1002/(SICI)1520-6750(199608)43:5<629::AID-NAV3>3.0.CO
[6]  
2-7
[7]   Customer order scheduling in a general job shop environment [J].
Blocher, JD ;
Chhajed, D ;
Leung, M .
DECISION SCIENCES, 1998, 29 (04) :951-981
[8]  
Chen Z-L, 2001, SUPPLY CHAIN SCHEDUL
[9]   OPTIMAL SCHEDULING OF PRODUCTS WITH 2 SUBASSEMBLIES ON A SINGLE-MACHINE [J].
COFFMAN, EG ;
NOZARI, A ;
YANNAKAKIS, M .
OPERATIONS RESEARCH, 1989, 37 (03) :426-436
[10]   SIMULTANEOUS RESOURCE SCHEDULING TO MINIMIZE WEIGHTED FLOW TIMES [J].
DOBSON, G ;
KARMARKAR, US .
OPERATIONS RESEARCH, 1989, 37 (04) :592-600