Simultaneous job input sequencing and vehicle dispatching in a single-vehicle automated guided vehicle system: a heuristic branch-and-bound approach coupled with a discrete events simulation model

被引:41
作者
Lacomme, P
Moukrim, A
Tchernev, N [1 ]
机构
[1] Univ Auvergne, CNRS, UMR 6158, LIMOS, Clermont Ferrand, France
[2] Univ Clermont Ferrand, CNRS, UMR 6158, LIMOS, F-63177 Clermont Ferrand, France
[3] Univ Technol Compiegne, HeuDiaSyC, CNRS, UMR 6599, F-60205 Compiegne, France
关键词
flexible manufacturing system; branch-and-bound; simulation; job sequencing; AGV dispatching;
D O I
10.1080/13528160412331326450
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses the scheduling problem in automated manufacturing environments, whose problem encompasses all the decisions related to the allocation of resources over the time horizon in order to best satisfy a set of objectives. It concentrates in particular on the job-input sequencing and vehicle-dispatching problems in a manufacturing environment using a single-vehicle automated guided vehicle system. The problem is solved using a branch-and-bound coupled with a discrete event simulation model. The branch-and-bound focuses on the job-input sequencing problem to determine the order in which the jobs enter the manufacturing system. The discrete event simulation model evaluates this job sequence under given vehicle and machine dispatching rules. The discrete event simulation model permits one to take into account all the working constraints: the maximal number of jobs simultaneously allowed in the system, the input/output buffers with finite capacities, the dynamic behaviour of the system under study and, thus, the impact of vehicle blocking and congestion as well as the impact of the machine blocking. A benchmark test is performed to investigate the system performances and the makespan depending on the job input sequencing, the vehicle and machine dispatching. The framework is benchmarked on 20 instances under different vehicle dispatching rules.
引用
收藏
页码:1911 / 1942
页数:32
相关论文
共 42 条
[1]  
[Anonymous], 1989, GENETIC ALGORITHM SE
[2]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[3]  
[Anonymous], 1987, SIMULATED ANNEALING
[4]   Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies [J].
Anwar, MF ;
Nagi, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (03) :653-681
[5]  
Araki T., 1977, 2 IBM S MATH FDN COM, P229
[6]   DEADLOCK-AVOIDANCE IN FLEXIBLE MANUFACTURING SYSTEMS WITH CONCURRENTLY COMPETING PROCESS FLOWS [J].
BANASZAK, ZA ;
KROGH, BH .
IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 1990, 6 (06) :724-734
[7]  
BANKS J, 1994, P 1994 WINT SIM C AS, P26
[8]   A time window approach to simultaneous scheduling of machines and material handling system in an FMS [J].
Bilge, U ;
Ulusoy, G .
OPERATIONS RESEARCH, 1995, 43 (06) :1058-1070
[9]  
Blazewicz J., 1991, International Journal of Flexible Manufacturing Systems, V4, P5, DOI 10.1007/BF01325094
[10]   SURVEY OF SCHEDULING RESEARCH INVOLVING DUE DATE DETERMINATION DECISIONS [J].
CHENG, TCE ;
GUPTA, MC .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 38 (02) :156-166