Progress, status, and plans for the HRIBF project

被引:2
作者
Olsen, DK
Auble, RL
Alton, GD
Bailey, JD
Dinehart, MR
Dukes, CL
Dowling, DT
Haynes, DL
Jones, CM
Lane, SM
LeCroy, CT
Juras, RC
Meigs, MJ
Mills, GD
Mosko, SW
Mueller, PE
Murray, SN
Tatum, BA
Welton, RF
Wollnik, H
机构
[1] JOINT INST HEAVY ION RES,KNOXVILLE,TN
[2] UNIV TENNESSEE,KNOXVILLE,TN
[3] OAK RIDGE ASSOCIATED UNIV,ATLANTA,GA
[4] GEORGIA INST TECHNOL,ATLANTA,GA 30332
[5] UNIV GIESSEN,GIESSEN,GERMANY
关键词
D O I
10.1016/S0168-9002(96)00398-1
中图分类号
TH7 [仪器、仪表];
学科分类号
0804 ; 080401 ; 081102 ;
摘要
Over the last three years, the Holifield accelerator system has been reconfigured into a first-generation radioactive ion beam facility, the HRIBF, a national user facility for RIB research. The construction and reconfiguration have been completed and the equipment commissioning and beam development phases have started. The progress to date, the present status, and future plans will be given. The special problems connected with the production and acceleration of RIBs will be discussed.
引用
收藏
页码:197 / 206
页数:10
相关论文
共 10 条
[1]  
Allardyc B.W., 1989, TREATISE HEAVY ION S, V8, P363
[2]  
ALTON GD, 1995, 7 INT C HEAV ION ACC
[3]  
ALTON GD, 1996, NUCL INSTR METH A, V382
[4]  
BAILEY JD, 1995, IN PRESS P PART ACC
[5]  
DOWLING DT, 1995, IN PRESS P PART ACC
[6]  
GARRETT JD, 1991, PROPOSAL PHYSICS EXO
[7]   A SIMPLE, INEXPENSIVE VOLTAGE GRADING RESISTOR FOR LARGE ELECTROSTATIC ACCELERATORS [J].
HAYNES, DL ;
JONES, CM ;
JURAS, RC ;
MEIGS, MJ ;
RAATZ, JE ;
SCHROEDER, JB .
NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1992, 320 (1-2) :400-402
[8]  
MANTICA PF, 1994, ORNL6842 PHYS DIV
[9]  
MEIGS MJ, 1995, IN PRESS P PART ACC
[10]  
OLSEN DK, 1992, P WORKSH PROD US INT, P375