Incorporating a district heating/cooling system into an existing geothermal power plant

被引:15
作者
Kanoglu, M [1 ]
Cengel, YA [1 ]
Turner, RH [1 ]
机构
[1] Univ Nevada, Dept Mech Engn 312, Reno, NV 89557 USA
来源
JOURNAL OF ENERGY RESOURCES TECHNOLOGY-TRANSACTIONS OF THE ASME | 1998年 / 120卷 / 02期
关键词
D O I
10.1115/1.2795031
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Geothermal energy has been used for power generation, space and process heating, and to a lesser extent, space cooling. However, it is rarely used for cogeneration. This paper shows how a district heating/cooling system can be incorporated into an existing geothermal power plant to make the best use of extracted hot brine. In the power plant analysis, exergy destruction throughout the plant is quantified and illustrated using an exergy cascade. The primary source of exergy destruction in the plant is determined to be the reinjection of used brine into the ground, which accounts for 48.1 pet-cent of the total exergy destruction. The overall first and the second law efficiencies of the plant are calculated to be 5.6 and 28.3 percent, respectively, based on the exergy of the geothermal fluid at downwell, and 5.7 and 28.6 percent, respectively based on the exergy of the geothermal fluid at wellhead A binary system is considered for the heating/cooling district to avoid corrosion and scaling problems. The heating system, as designed, has the capability to meet the entire needs of the Reno industrial Park under peak load conditions, and has 30 percent reserve for future expansion. An absorption system will be used for the cooling of the intended 40 percent floor space of the industrial park. An economic analysis shows that the incorporation of the the district heating/cooling system with 2,785,000 m(2) of floor space connected to the geothermal grid appears to be feasible, and financially very attractive. Further, using the returning freshwater from the district heating/cooling system for partial cooling of the binary fluid of the power plant can save lip to 15 percent of the fan work.
引用
收藏
页码:179 / 184
页数:6
相关论文
共 9 条
[1]  
*ASHRAE, 1995, HDB APPL
[2]  
Cengel Y., 1997, THERMODYNAMICS ENG A, VNinth
[3]  
DIPIPPO R, 1984, GEOTHERMAL RESOURCES, V8
[4]  
DIPIPPO RA, 1994, GEOTHERMAL RESOURCES, V18
[5]  
KANOGLU M, 1996, ASME AES, V36
[6]  
KESTIN J, 1978, AVAILABLE WORK GEOTH
[7]  
RAFFERTY KD, 1990, SL90172 ASHRAE
[8]  
Sauer H.J., 1994, PRINCIPLES HEATING V
[9]  
Wark K., 1995, ADV THERMODYNAMICS E