Inter-agent cooperation and communication for agent-based robust dynamic scheduling in steel production

被引:40
作者
Ouelhadj, D
Petrovic, S
Cowling, PI
Meisels, A
机构
[1] Univ Nottingham, Sch Comp Sci & IT, Automated Scheduling Optimisat & Planning Res Grp, Nottingham NG8 1BB, England
[2] Univ Bradford, Dept Comp, Modelling Optimisat Scheduling & Intelligent Comp, Bradford BD7 1DP, W Yorkshire, England
[3] Ben Gurion Univ Negev, Dept Comp Sci, IL-84105 Beer Sheva, Israel
基金
英国工程与自然科学研究理事会;
关键词
steel production; multi-agent systems; cooperation and coordination; contract net protocol; dynamic scheduling; robust scheduling;
D O I
10.1016/j.aei.2004.10.003
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
This paper describes a negotiation protocol proposed for inter-agent cooperation in a multi-agent system that we developed for optimisation and dynamic integrated scheduling within steel production. The negotiation protocol is a two-level bidding mechanism based on the Contract Net Protocol. The purpose of this protocol is to allow the agents to cooperate and coordinate their local schedules in order to find globally near-optimal robust schedules, whilst minimising the disruption caused by the occurrence of unexpected real-time events. We conduct several experiments to investigate the performance of this negotiation protocol to coordinate the agents in generating good quality robust schedules. This performance is evaluated in terms of stability and utility measures used to evaluate the robustness of the steel production processes in the presence of real-time events. (c) 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:161 / 172
页数:12
相关论文
共 38 条
[1]  
[Anonymous], 1997, Tabu Search
[2]   Modeling rolling batch planning as vehicle routing problem with time windows [J].
Chen, X ;
Wan, WS ;
Xu, XH .
COMPUTERS & OPERATIONS RESEARCH, 1998, 25 (12) :1127-1136
[3]   Using real time information for effective dynamic scheduling [J].
Cowling, P ;
Johansson, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 139 (02) :230-244
[4]  
Cowling P., 2000, Journal of Scheduling, V3, P185, DOI 10.1002/1099-1425(200007/08)3:4<185::AID-JOS42>3.0.CO
[5]  
2-G
[6]  
COWLING P, 1995, OPTIMIZATION IND, P55
[7]   A multi-agent architecture for dynamic scheduling of steel hot rolling [J].
Cowling, PI ;
Ouelhadj, D ;
Petrovic, S .
JOURNAL OF INTELLIGENT MANUFACTURING, 2003, 14 (05) :457-470
[8]  
COWLING PI, 2000, P 19 WORKSH PLANN SC, P45
[9]  
COWLING PI, 2004, SPEC ISS APPL MULTI, V1, P1
[10]  
COWLING PI, 2001, P 3 INT ICSC WORLD M, P104