AGA (Asset Governance Assessment) for analyzing affect of subsidy on MC (Marginal Cost) in electricity distribution sector

被引:6
作者
Dashti, Reza [1 ]
Afsharnia, Saeed [1 ]
Ghaderi, Farid [2 ]
机构
[1] Univ Tehran, Sch Elect & Comp Engn, Tehran, Iran
[2] Univ Tehran, Dept Ind Engn, Tehran, Iran
关键词
Electricity distribution; Asset governance; Marginal cost; Subsidy; POLICY;
D O I
10.1016/j.energy.2010.08.022
中图分类号
O414.1 [热力学];
学科分类号
摘要
Nowadays subsidy payments on electrical energy have to be managed and controlled to prevent any side effect particularly in developing countries. Effects of some external factors on Energy consumption and electricity distribution indices are analyzed in this paper. External factors are classified into three categories of social behavior, governance and urban planning. MC (Marginal Cost) of electricity in distribution is considered as the main index to be analyzed. Also, ANN (Artificial Neural Network) is applied to simulate effect of the mentioned factors on MC of distribution sector. Numerical investigation on the indices for a sample DISCO (Distribution Company) in Iran is made, results indicate that the more subsidies are allocated to consumers the more MC is increased. AGA (Asset Governance Assessment), which is proposed as a kind of governance decision, could improve the performance efficiency and avoid lose of activities done by DISCOs through subsidy management. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:4996 / 5007
页数:12
相关论文
共 27 条
[1]   Pricing power outages in the Netherlands [J].
Baarsma, Barbara E. ;
Hop, J. Peter .
ENERGY, 2009, 34 (09) :1378-1386
[2]   Establishing an efficient regulatory mechanism-Prerequisite for successful energy activities regulation [J].
Banovac, Eraldo ;
Glavic, Mevludin ;
Tesnjak, Sejid .
ENERGY, 2009, 34 (02) :178-189
[3]   Ancillary services and optimal household energy management with photovoltaic production [J].
Clastres, C. ;
Pham, T. T. Ha ;
Wurtz, F. ;
Bacha, S. .
ENERGY, 2010, 35 (01) :55-64
[4]  
CORAZON MS, 1983, ENERGY, V3, P45
[5]   Solving the revenue reconciliation problem of distribution network providers using long-term marginal prices [J].
de Leao, MTP ;
Saraiva, JT .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2003, 18 (01) :339-345
[6]   Mean-risk efficient portfolio analysis of demand response and supply resources [J].
Deng, Shi-Jie ;
Xu, Li .
ENERGY, 2009, 34 (10) :1523-1529
[7]   Evaluation of the effectiveness of an energy efficiency program for new home construction in eastern North Carolina [J].
Dixon, Gene ;
Abdel-Salam, Tarek ;
Kauffmann, Paul .
ENERGY, 2010, 35 (03) :1491-1496
[8]   Greek long-term energy consumption prediction using artificial neural networks [J].
Ekonomou, L. .
ENERGY, 2010, 35 (02) :512-517
[9]   Uniform marginal pricing for the remuneration of distribution networks [J].
Jesús, PMD ;
de Leao, MTP ;
Yusta, JM ;
Khodr, HM ;
Urdaneta, AJ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1302-1310
[10]   Time series models (Grey-Markov, Grey Model with rolling mechanism and singular spectrum analysis) to forecast energy consumption in India [J].
Kumar, Ujjwal ;
Jain, V. K. .
ENERGY, 2010, 35 (04) :1709-1716