Unified solution of a non-convex SCUC problem using combination of modified Branch-and-Bound method with Quadratic Programming

被引:48
作者
Shafie-khah, M. [1 ]
Moghaddam, M. Parsa [1 ]
Sheikh-El-Eslami, M. K. [1 ]
机构
[1] Tarbiat Modares Univ, Dept Elect & Comp Engn, Tehran, Iran
关键词
Branch-and-Bound method; Quadratic programming; Security constraint unit commitment; Non-convexity; Contingency analysis; Nonlinear/linear AC power flow; CONSTRAINED UNIT COMMITMENT; ECONOMIC-DISPATCH;
D O I
10.1016/j.enconman.2011.07.012
中图分类号
O414.1 [热力学];
学科分类号
摘要
In this paper, a new practical method is presented for solving the non-convex security constraint unit commitment (SCUC) problem in power systems. The accuracy of the proposed method is desirable while the shorter computation time makes it useful for SCUC solution of large-scale power systems, real-time market operation and long-term SCUC problems. The proposed framework allows inclusion of the valve point effects, warmth-dependent start-up costs, ramp rates, minimum up/down time constraints, multiple fuels costs, emission costs, prohibited operating zones and AC power flow limits in normal and contingency conditions. To solve the non-convex problem, combination of a modified Branch-and-Bound method with the Quadratic Programming is used as an optimization tool and a developed AC power flow algorithm is applied for considering the security and contingency concerns using the nonlinear/linear AC model. These modifications improve the convergence speed and solution precision of SCUC problem. In the proposed method, in contrast with traditional SCUC algorithms, unit commitment solution, checking and satisfying the security constraints are managed simultaneously. The obtained results are compared with other reported methods for investigating the effectiveness of the proposed method. Also, the proposed method is applied to an Iranian power system including 493 thermal units. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:3425 / 3432
页数:8
相关论文
共 18 条
[1]   Security Constrained Unit Commitment by a new adaptive hybrid stochastic search technique [J].
Amjady, Nima ;
Nasiri-Rad, Hadi .
ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (02) :1097-1106
[2]   Semi-definite programming-based method for security-constrained unit commitment with operational and optimal power flow constraints [J].
Bai, X. ;
Wei, H. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2009, 3 (02) :182-197
[3]  
Bartak R., CONSTRAINT PROGRAMMI
[4]  
Chun-Lung Chen, 2002, Journal of the Chinese Institute of Electrical Engineering, V9, P181
[5]   AC contingency dispatch based on security-constrained unit commitment [J].
Fu, Y ;
Shahidehpour, M ;
Li, ZY .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2006, 21 (02) :897-908
[6]   Security-constrained unit commitment with AC constraints [J].
Fu, Y ;
Shahidehpour, M ;
Li, ZY .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (03) :1538-1550
[7]   Fast SCUC for large-scale power systems [J].
Fu, Yong ;
Shahidehpour, Mohammad .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2007, 22 (04) :2144-2151
[8]   An Improved Integer Coded Genetic Algorithm for Security Constrained Unit Commitment Problem [J].
Golestani, S. ;
Raoofat, M. ;
Farjah, E. .
2008 IEEE 2ND INTERNATIONAL POWER AND ENERGY CONFERENCE: PECON, VOLS 1-3, 2008, :1251-+
[9]   Unified solution of security-constrained unit commitment problem using a linear programming methodology [J].
Grey, A. ;
Sekar, A. .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2008, 2 (06) :856-867
[10]   The conditions for obtaining feasible solutions to security-constrained unit commitment problems [J].
Guan, XH ;
Guo, SG ;
Zhai, QZ .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2005, 20 (04) :1746-1756