Simulation study of the world's first distributed premium power quality park

被引:38
作者
Domijan, A [1 ]
Montenegro, A
Keri, AJF
Mattern, KE
机构
[1] Univ Florida, Dept Elect & Comp Engn, Gainesville, FL 32611 USA
[2] Amer Elect Power Co, Gahanna, OH 43230 USA
[3] S&C Elect Co, Orlando, FL 32826 USA
关键词
custom power; DVR; EMTP; FRIENDS; power park; power quality; PPP; STS; SVC;
D O I
10.1109/TPWRD.2004.839182
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper describes the performance of the world's first premium power park (PPP) located at the Delaware Industrial Park in Delaware, Ohio.Issues such as the need for a supervisor system to coordinate the responses of the different power quality devices and the study of the combined operation or interaction of a dynamic voltage restorer (DVR), a static var compensator (SVC), and a transfer switch in close electrical proximity are discussed in this paper. The system response to different power. disturbances is simulated in EMTP-ATPdraw and compared to field measurements. The PPP presented here is just an approach to a premium power system, which is considered the next step in the evolution of power quality.
引用
收藏
页码:1483 / 1492
页数:10
相关论文
共 12 条
[1]  
ALVAREZ C, P 9 INT C HARM QUAL, V2, P444
[2]   CIRCUIT-BREAKER MODEL FOR DIGITAL-SIMULATION BASED ON MAYRS AND CASSIES DIFFERENTIAL ARC EQUATIONS [J].
BIZJAK, G ;
ZUNKO, P ;
POVH, D .
IEEE TRANSACTIONS ON POWER DELIVERY, 1995, 10 (03) :1310-1315
[3]  
*CAN AM EMTP US GR, ALT TRANS PROG ATP R
[4]  
DOMIJAN A, P 9 INT C HARM QUAL, V2, P379
[5]  
*EPRI AEP, 2000, PREM POW PARK PPP PH
[6]  
ISE T, 1999, P 61 AM POW C CHIC I
[7]  
ISE T, 2000, P INT C POW SYST TEC, V2, P661
[8]  
MISHIMA Y, P INT C EL ENG ICEE, V1, P346
[9]  
Nara K, 1997, ELECTR ENG JPN, V121, P26, DOI 10.1002/(SICI)1520-6416(199710)121:1<26::AID-EEJ4>3.0.CO
[10]  
2-1