Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation

被引:98
作者
Lin, X [1 ]
Floudas, CA [1 ]
机构
[1] Princeton Univ, Dept Chem Engn, Princeton, NJ 08544 USA
关键词
design and scheduling; multipurpose batch process; continuous-time formulation; MILP; MINLP;
D O I
10.1016/S0098-1354(01)00663-9
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Design, synthesis and scheduling issues are considered simultaneously for multipurpose batch plants. An earlier proposed continuous-time formulation for scheduling is extended to incorporate design and synthesis. Processing recipes are represented by the State-Task Network (STN). The superstructure of all possible plant designs is constructed according to the potential availability of all processing/storage units. The proposed model takes into account the trade-offs between capital costs, revenues and operational flexibility. Computational studies are presented to illustrate the effectiveness of the proposed formulation. Both linear and nonlinear models are included, resulting in MILP and mixed-integer nonlinear programming (MINLP) problems. respectively. The MILP problems are solved using a branch and bound method. Globally optimal solutions are obtained for the nonconvex MINLP problems based on a key property that arises due to the special structure of the resulting models. Comparisons with earlier approaches are also presented. (C) 2001 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:665 / 674
页数:10
相关论文
共 19 条
[1]   A global optimization method, αBB, for general twice-differentiable constrained NLPs -: I.: Theoretical advances [J].
Adjiman, CS ;
Dallwig, S ;
Floudas, CA ;
Neumaier, A .
COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 (09) :1137-1158
[2]   A global optimization method, αBB, for general twice-differentiable constrained NLPs -: II.: Implementation and computational results [J].
Adjiman, CS ;
Androulakis, IP ;
Floudas, CA .
COMPUTERS & CHEMICAL ENGINEERING, 1998, 22 (09) :1159-1179
[3]   DETAILED DESIGN OF MULTIPURPOSE BATCH PLANTS [J].
BARBOSAPOVOA, AP ;
MACCHIETTO, S .
COMPUTERS & CHEMICAL ENGINEERING, 1994, 18 (11-12) :1013-1042
[4]   INCORPORATING SCHEDULING IN THE OPTIMAL-DESIGN OF MULTIPRODUCT BATCH PLANTS [J].
BIREWAR, DB ;
GROSSMANN, IE .
COMPUTERS & CHEMICAL ENGINEERING, 1989, 13 (1-2) :141-161
[5]  
Floudas C.A, 2000, NONCON OPTIM ITS APP, DOI 10.1007/978-1-4757-4949-6
[6]  
Floudas C.A., 1995, NONLINEAR MIXED INTE
[7]   OPTIMUM DESIGN OF MULTIPURPOSE CHEMICAL-PLANTS [J].
GROSSMANN, IE ;
SARGENT, RWH .
INDUSTRIAL & ENGINEERING CHEMISTRY PROCESS DESIGN AND DEVELOPMENT, 1979, 18 (02) :343-348
[8]   Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4341-4359
[9]   Effective continuous-time formulation for short-term scheduling.: 3.: Multiple intermediate due dates [J].
Ierapetritou, MG ;
Hené, TS ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1999, 38 (09) :3446-3461
[10]   Effective continuous-time formulation for short-term scheduling. 2. Continuous and semicontinuous processes [J].
Ierapetritou, MG ;
Floudas, CA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1998, 37 (11) :4360-4374