A study on sidewall displacement prediction and stability evaluations for large underground power station caverns

被引:71
作者
Zhu, W. S. [1 ,2 ]
Li, X. J. [3 ]
Zhang, Q. B. [1 ]
Zheng, W. H. [1 ]
Xin, X. L. [1 ]
Sun, A. H. [1 ]
Li, S. C. [1 ]
机构
[1] Shandong Univ, Geotech & Struct Engn Res Ctr, Jinan 250061, Peoples R China
[2] Chinese Acad Sci, Inst Rock & Soil Mech, Wuhan 430071, Peoples R China
[3] Shandong Jianzhu Univ, Sch Civil Engn, Jinan 250101, Peoples R China
关键词
Numerical analysis; Multiple rock openings; Displacement prediction; Stability evaluation method; Underground powerstation caverns; WAVE-PROPAGATION; ROCK MASS; EXCAVATION;
D O I
10.1016/j.ijrmms.2010.07.008
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
Based on an opening complex for a hydropower station in China, an equation considering four basic factors was fitted for prediction of displacement at the keypoint on the high sidewalls of the powerhouse, on the basis of a large number of numerical simulations. The basic factors include rock deformation modulus, overburden depth of caverns, height of the powerhouse and the lateral pressure coefficient of the initial stress. Quasi-three-dimensional stability analyses were carried out by using FLAC3D. With an equation, theelasto-plastic displacement and elastic displacement at a sidewall key point can be calculated quickly. The equation was applied to predict the displacements at key points on the sidewalls for caverns of nine projects. The computation results were compared with numerical modeling or back-analysis results. In addition, in order to consider the effects of cavern spacing, anew equation was proposed. Finally, three possible criteria for stability evaluation of the rock masses were considered. It is suggested that the rock stability is assessed by the ratio 0(c) between the elasto-plastic displacement and the elastic displacement, which is commonly applicable. The stability of the surrounding rock for the above-mentioned nine underground projects was evaluated by the method. Long prestressed cables were considered to be needed to reinforce the sidewalls in order to ensure the stability of the caverns for some of the projects. For the actual design and construction of the five relevant projects, long prestressed cables were employed for reinforcement of high sidewalls. This showed that the evaluation criterion was valid. (c) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1055 / 1062
页数:8
相关论文
共 24 条
[1]  
[安红刚 An Honggang], 2003, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V22, P1760
[2]  
[Anonymous], P 8 INT C ROCK MECH
[3]  
Barla Giovanni, 2008, GEOMECH TUNNELBAU, V1, P399
[4]  
Dhawan K.R., 2004, International Journal of Geomechanics, ASCE, V4, P224, DOI DOI 10.1061/(ASCE)1532-3641(2004)4:3(224)
[5]   On modelling of incident boundary for wave propagation in jointed rock masses using discrete element method [J].
Fan, SC ;
Jiao, YY ;
Zhao, J .
COMPUTERS AND GEOTECHNICS, 2004, 31 (01) :57-66
[6]  
Hibino S, 1999, NINTH INTERNATIONAL CONGRESS ON ROCK MECHANICS, VOLS 1 & 2, P385
[7]   Numerical investigation of joint effect on shock wave propagation in jointed rock masses [J].
Jiao, YY ;
Fan, SC ;
Zhao, J .
JOURNAL OF TESTING AND EVALUATION, 2005, 33 (03) :197-203
[8]  
LEE YN, 1995, P 8 INT C ROCK MECH, P505
[9]  
[李宁 LI Ning], 2006, [岩石力学与工程学报, Chinese Journal of Rock Mechanics and Engineering], V25, P1941
[10]   Simulation of excavations in jointed rock masses using a practical equivalent continuum approach [J].
Sitharam, TG ;
Latha, GM .
INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2002, 39 (04) :517-525