Plant location and procurement planning in knockdown production systems

被引:6
作者
Lim, SK
Kim, YD [1 ]
机构
[1] Korea Adv Inst Sci & Technol, Dept Ind Engn, Yusong Gu, Taejon 305701, South Korea
[2] PricewaterhouseCoopers, Seoul, South Korea
关键词
knockdown production systems; plant location; components procurement;
D O I
10.1057/palgrave.jors.2601095
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider an integrated problem of plant location and capacity planning for components procurement in knockdown production systems. The problem is that of determining the schedule of opening components manufacturing plants, plans for acquisition of capacities in opened components manufacturing plants, and plans for components procurement in final assembly plants with the objective of minimizing the sum of fixed costs for opening plants; acquisition and operation costs of facilities, and delivery and subcontracting costs of components. The problem is formulated as a mixed integer linear program and solved by a two-stage solution procedure. In the solution procedure, the problem is decomposed into two tractable subproblems and these subproblems are solved sequentially. In the first stage, a dynamic plant location problem is solved using a cut and branch algorithm based on Gomory cuts, while a multiperiod capacity planning problem is solved in the second stage by a heuristic algorithm that uses a cut and branch algorithm and a variable reduction scheme. The solution procedure is tested on problems of a practical size and results show that the procedure gives reasonably good solutions.
引用
收藏
页码:271 / 282
页数:12
相关论文
共 18 条
[1]   Lagrangean heuristics applied to a variety of large capacitated plant location problems [J].
Agar, MC ;
Salhi, S .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (10) :1072-1084
[2]   Gomory cuts revisited [J].
Balas, E ;
Ceria, S ;
Cornuejols, G ;
Natraj, N .
OPERATIONS RESEARCH LETTERS, 1996, 19 (01) :1-9
[3]   LOW-INVENTORY ORDERING SYSTEMS FOR THE INTERNATIONAL CO-OPERATIVE KNOCKDOWN PRODUCTION SYSTEMS [J].
HIRAKI, S ;
ICHIMURA, T ;
ISHII, K ;
NAGAMURA, T ;
ANDO, Y ;
TAKAHASHI, K ;
MURAMATSU, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (05) :831-846
[4]   TRADE-OFF ANALYSIS OF BUFFER STOCK VERSUS EMERGENCY DELIVERY IN THE KNOCKDOWN PRODUCTION SYSTEMS [J].
HIRAKI, S ;
ISHII, K ;
TAKAHASHI, K ;
MURAMATSU, R .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1990, 20 (02) :129-138
[5]   DESIGNING A PULL-TYPE PARTS PROCUREMENT SYSTEM FOR INTERNATIONAL COOPERATIVE KNOCKDOWN PRODUCTION SYSTEMS [J].
HIRAKI, S ;
ISHII, K ;
TAKAHASHI, K ;
MURAMATSU, R .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1992, 30 (02) :337-351
[6]   MODELING AN INTERNATIONAL COOPERATIVE GLOBAL COMPLEMENTARY PRODUCTION SYSTEM [J].
HIRAKI, S ;
WATANABE, N ;
ISHIHARA, Y ;
SU, YM .
COMPUTERS & INDUSTRIAL ENGINEERING, 1994, 27 (1-4) :205-208
[7]  
KATAYAMA H, 1998, P 1 KOR JAP JOINT C, P66
[8]   A CROSS DECOMPOSITION ALGORITHM FOR A MULTIPRODUCT MULTITYPE FACILITY LOCATION PROBLEM [J].
LEE, CY .
COMPUTERS & OPERATIONS RESEARCH, 1993, 20 (05) :527-540
[9]   DYNAMIC CAPACITY EXPANSION PROBLEM WITH MULTIPLE PRODUCTS - TECHNOLOGY SELECTION AND TIMING OF CAPACITY ADDITIONS [J].
LI, SL ;
TIRUPATI, D .
OPERATIONS RESEARCH, 1994, 42 (05) :958-976
[10]   Impact of product mix flexibility and allocation policies on technology [J].
Li, SL ;
Tirupati, D .
COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (07) :611-626