A bi-objective model for robust resource-constrained project scheduling

被引:180
作者
Al-Fawzan, MA
Haouari, M
机构
[1] King Abdulaziz City Sci & Technol, Riyadh 11442, Saudi Arabia
[2] Ecole Polytech Tunisie, La Marsa 2078, Tunisia
关键词
resource-constrained project scheduling; robust scheduling; multi-objective combinatorial optimization; tabu search;
D O I
10.1016/j.ijpe.2004.04.002
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A common problem which arises in project management is the fact that the planned schedule is often disrupted by several uncontrollable factors like additional time that might be required for rework and correction of detected defects. As a result, project managers are often unable to meet the promised completion dates. It is therefore vital to take into account such possible disruptions and their potential negative consequences at the project schedule design stage. In this paper, we address the issue of designing a project schedule which is not only short in time, but also less vulnerable to disruptions due to reworks and other undesirable conditions. To that aim, we introduce the concept of schedule robustness and we develop a bi-objective resource-constrained project scheduling model. We consider the objectives of robustness maximization along with makespan minimization. We develop a tabu search algorithm in order to generate an approximate set of efficient solutions. Several variants of the algorithm are tested and compared on a large set of benchmark problems. (c) 2004 Elsevier B.V. All rights reserved.
引用
收藏
页码:175 / 187
页数:13
相关论文
共 37 条
  • [1] [Anonymous], 1998, MASTERING PROJECT MA
  • [2] [Anonymous], J MULTICRITERIA DECI, DOI DOI 10.1002/(SICI)1099-1360(199907)8:4{
  • [3] Baar T., 1999, Meta-heuristics: Advances and trends in local search paradigms for optimization, P1
  • [4] BENABDELAZIZ F, 1999, METAHEURISTICS ADV T, P205
  • [5] BLAZEWICZ J, 1986, ANN OPERATIONS RES, V7
  • [6] Resource-constrained project scheduling: Notation, classification, models, and methods
    Brucker, P
    Drexl, A
    Mohring, R
    Neumann, K
    Pesch, E
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 112 (01) : 3 - 41
  • [7] A multiobjective operations planning model with unit commitment and transmission constraints
    Chattopadhyay, D
    Momoh, J
    [J]. IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (03) : 1078 - 1084
  • [8] Cooper K.G., 1993, PROJECT MANAGEMENT J, V24, P17
  • [9] Czyzak P., 1998, J MULTICRITERIA DECI, V7, P34, DOI DOI 10.1002/(SICI)1099-1360(199801)7:1<34::AID-MCDA161>3.0.CO
  • [10] 2-6