The responsiveness of Italian small-to-medium sized plants: dimensions and determinants

被引:15
作者
Belvedere, Valeria [1 ]
Grando, Alberto [1 ]
Papadimitriou, Thanos [1 ]
机构
[1] SDA Bocconi Sch Management, Operat & Technol Management Unit, I-20136 Milan, Italy
关键词
responsiveness; flexibility; plant performances; SMEs; set-up; KPIs; LEAD-TIME REDUCTION; PERFORMANCE-MEASUREMENT; FORM POSTPONEMENT; SUPPLY CHAIN; FLEXIBILITY;
D O I
10.1080/00207540903234751
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper presents a quantitative study carried out on more than 200 manufacturing plants located in Italy. The study aimed to explore whether small-to-medium sized enterprises (SMEs) in Italy are more responsive than large enterprises and determine what the levers are that these enterprises would employ to achieve their responsiveness. Logistic responsiveness has been considered a key driver of competitiveness. Several studies have suggested that company size is a major determinant of responsiveness and that SMEs have both strengths and weaknesses that influence their ability to promptly react to customer needs. The evidence of this study indicates that SMEs are more responsive than large companies in terms of delivery. This performance advantage is mainly the result of a rather narrow product range and a simpler product structure that allows SMEs to enjoy shorter manufacturing and assembly lead times. On the other hand, this study also shows that SMEs perform worse than large enterprises with respect to longer set-up times.
引用
收藏
页码:6481 / 6498
页数:18
相关论文
共 45 条
[1]  
[Anonymous], 1983, EFFICIENCY MANUFACTU
[2]  
Azzone G., 1991, International Journal of Operations & Production Management, V11, P77, DOI 10.1108/01443579110143412
[3]  
BARCLAY I, 1996, P INT C ENG TECHN MA, P52
[4]   Lead-time reduction in a stochastic inventory system with learning consideration [J].
Ben-Daya, M ;
Hariga, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (03) :571-579
[5]  
Blackburn J.D., 1991, Time-Based Competition
[6]   A contingency view of time-based competition for manufacturers [J].
Bozarth, C ;
Chapman, S .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1996, 16 (06) :56-+
[7]   A comparison of practice-performance models between small manufacturers and subcontractors [J].
Cagliano, R ;
Spina, G .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2002, 22 (12) :1367-1388
[8]  
Cagliano R., 2001, INTEG MANUF SYST, V12, P469
[9]   Strategic and operational choices for small subcontracting firms - Empirical results and an interpretative model [J].
DeToni, A ;
Nassimbeni, G .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1996, 16 (06) :41-&
[10]  
Fisher ML, 1997, HARVARD BUS REV, V75, P105