Problems facing parties involved in build, operate, and transport projects in Egypt

被引:49
作者
Askar, MM [1 ]
Gab-Allah, AA [1 ]
机构
[1] Zagazig Univ, Fac Engn, Construct Engn Dept, Zagazig, Egypt
基金
奥地利科学基金会;
关键词
D O I
10.1061/(ASCE)0742-597X(2002)18:4(173)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
One of the newest financial schemes for environmental projects is the Build, Operate, and Transfer (BOT) concept, which is being used increasingly worldwide as a project delivery system by which governments obtain the infrastructure projects by private sector after a concession period free of charge. In the Egyptian environment up to now, promoters and investors have had many fears toward declared projects. This study aims to investigate the potential for implementing the BOT system in the Egyptian environment. This can be achieved by giving a clear view of BOT and of its problems, risk areas, and features, pertaining to the Egyptian environment, in order to maximize the benefits and minimize the risks as much as possible. The collected data was analyzed based on actual implementation in Egypt. This involved the following: (1) An overview of the critical success factors in order to achieve a BOT project; (2) an analysis of results obtained from questionnaires seeking to determine the possibility of occurrence of the different risk factors in the Egyptian environment, and their ranking-, (3) a comparison between the questionnaire results and the actual risks from requests for the proposal of locally advertised projects; and (4) a determination of the missed critical success factors in the Egyptian environment. The main conclusion of this study is that three critical success factors are essential for the success of BOT projects in Egypt: (1) Picking the right project; (2) competitive financial proposal; and (3) special features of bid.
引用
收藏
页码:173 / 178
页数:6
相关论文
共 12 条
[1]  
[Anonymous], 1995, PRIVATIZED INFRASTRU
[2]  
BADRAN M, 1996, P C INT CONTR B O T, V1
[3]  
ESQ LF, 1996, P C INT CONTR B O T, V1
[4]  
*MIN TRANSP, 1996, INV PROM DEV FIN CON
[5]  
NASSAR G, 1996, P C INT CONTR B O T, V1
[6]  
NOLAN JW, 1997, ARAB CONTRACTORS INF
[7]  
SHALAKANY A, 1996, P C INT CONTR B O T, V3
[8]  
TIONG LK, 1995, J CONSTR ENG M ASCE, V121, P183
[9]   IMPACT OF FINANCIAL PACKAGE VERSUS TECHNICAL SOLUTION IN A BOT TENDER [J].
TIONG, RLK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (03) :304-311
[10]   COMPETITIVE ADVANTAGE OF EQUITY IN BOT TENDER [J].
TIONG, RLK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (03) :282-289