Optimal power flow as a tool for fault level-constrained network capacity analysis

被引:73
作者
Vovos, PN [1 ]
Harrison, GP [1 ]
Wallace, AR [1 ]
Bialek, JW [1 ]
机构
[1] Univ Edinburgh, Sch Engn & Elect, Edinburgh EH9 3JL, Midlothian, Scotland
关键词
fault currents; load flow analysis; optimization methods; power generation planning;
D O I
10.1109/TPWRS.2005.846070
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The aim of this paper is to present a new method for the allocation of new generation capacity, which takes into account fault level constraints imposed by protection equipment such as switchgear. It simulates new generation capacities and connections to other networks using generators with quadratic cost functions. The coefficients of the cost functions express allocation preferences over connection points. The relation between capacity and subtransient reactance of generators is used during the estimation of fault currents. An iterative process allocates new capacity using optimal power flow mechanisms and readjusts capacity to bring fault currents within the specifications of switchgear. The method was tested on a 12-bus LV meshed network with three connection points for new capacity and one connection to an RV network. It resulted in significantly higher new generation capacity than existing first-come-first-served policies.
引用
收藏
页码:734 / 741
页数:8
相关论文
共 15 条
[1]  
*ANSI, 1987, C3706 ANSI
[2]   Voltage versus var/power-factor regulation on synchronous generators [J].
Eberly, TW ;
Schaefer, RC .
IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2002, 38 (06) :1682-1687
[3]  
Fogarty J. M., 2001, P IEEE INT EL MACH D, P51
[4]   Stability-constrained optimal power flow [J].
Gan, DQ ;
Thomas, RJ ;
Zimmerman, RD .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (02) :535-540
[5]  
Grainger J.J, 1994, POWER SYSTEM ANAL, P403
[6]   Maximising distributed generation capacity in deregulated markets [J].
Harrison, GP ;
Wallace, AR .
2003 IEEE PES TRANSMISSION AND DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, CONFERENCE PROCEEDINGS: BLAZING TRAILS IN ENERGY DELIVERY AND SERVICES, 2003, :527-530
[7]  
HARRISON GP, UNPUB P I ELECT ENG
[8]  
*INT STAND, 1988, 909 IEC
[9]  
*ISO, 2004, MAN 6 FIN TRANSM RIG
[10]   Voltage rise - the big issue when connecting embedded generation to long 11 kV overhead lines [J].
Masters, CL .