Optimizing supply chain collaboration based on joint replenishment and channel coordination

被引:72
作者
Chen, TH [1 ]
Chen, JM [1 ]
机构
[1] Natl Cent Univ, Inst Ind Management, Chungli 32054, Taiwan
关键词
supply chain; joint replenishment; channel coordination; transportation; Pareto improvements;
D O I
10.1016/j.tre.2004.06.003
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper proposes a joint replenishment program coupled with a channel coordination practice, to investigate their effect on supply chain improvements. We formulated several supply chain models, with a manufacturer supplying a family of products to a retailer, and the products sharing a common production facility. The models illustrate the challenge of integrating multi-items with multi-echelon production and replenishment. In addition, a saving-sharing mechanism, through a quantity discount scheme, is proposed so that Pareto improvements (i.e., one party is better off and the other is no worse off) can be achieved among channel participants. © 2004 Elsevier Ltd. All rights reserved.
引用
收藏
页码:261 / 285
页数:25
相关论文
共 53 条
[1]   Policies for inventory/distribution systems:: The effect of centralization vs. decentralization [J].
Abdul-Jalbar, B ;
Gutiérrez, J ;
Puerto, J ;
Sicilia, J .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2003, 81-2 :281-293
[2]  
Aksoy Y., 1988, International Journal of Operations & Production Management, V8, P63, DOI 10.1108/eb054814
[3]  
[Anonymous], MARKET SCI, DOI DOI 10.1287/MKSC.2.3.239
[4]   A joint replenishment policy for multi-echelon inventory control [J].
Axsäter, S ;
Zhang, WF .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1999, 59 (1-3) :243-250
[5]  
Banerjee A., 1992, International Journal of Technology Management, V7, P328
[6]   An integrated JIT inventory model [J].
Banerjee, A ;
Kim, SL .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 1995, 15 (09) :237-&
[7]   A JOINT ECONOMIC-LOT-SIZE MODEL FOR PURCHASER AND VENDOR [J].
BANERJEE, A .
DECISION SCIENCES, 1986, 17 (03) :292-311
[8]   AN ANALYSIS OF INVENTORY AND TRANSPORTATION COSTS IN A CONSTRAINED NETWORK [J].
BENJAMIN, J .
TRANSPORTATION SCIENCE, 1989, 23 (03) :177-183
[9]   THE MULTIITEM JOINT REPLENISHMENT PROBLEM WITH TRANSPORTATION AND CONTAINER EFFECTS [J].
BENKHEDHER, N ;
YANO, CA .
TRANSPORTATION SCIENCE, 1994, 28 (01) :37-54
[10]   SYNCHRONIZING PRODUCTION AND TRANSPORTATION SCHEDULES [J].
BLUMENFELD, DE ;
BURNS, LD ;
DAGANZO, CF .
TRANSPORTATION RESEARCH PART B-METHODOLOGICAL, 1991, 25 (01) :23-37