Development steps for parabolic trough solar power technologies with maximum impact on cost reduction

被引:65
作者
Pitz-Paal, Robert [1 ]
Dersch, Juergen
Milow, Barbara
Tellez, Felix
Ferriere, Alain
Langnickel, Ulrich
Steinfeld, Aldo
Karni, Jacob
Zarza, Eduardo
Popel, Oleg
机构
[1] Deutsch Zentrum Luft & Raumfahrt eV, D-51147 Cologne, Germany
[2] CIEMAT, Ctr Invest Energet Medioambientales & Technol, E-28040 Madrid, Spain
[3] CNRS, F-66125 Ft Romeu, France
[4] VGB Power Tech eV, D-45136 Essen, Germany
[5] ETH, CH-8092 Zurich, Switzerland
[6] Paul Scherrer Inst, CH-5232 Villigen, Switzerland
[7] Weizmann Inst Sci, IL-76100 Rehovot, Israel
[8] CIEMAT, Ctr Invest Energet Medioambientales & Technol, PSA, E-04200 Tabernas, Spain
[9] Russian Acad Sci, Inst High Temp, RU-125412 Moscow, Russia
来源
JOURNAL OF SOLAR ENERGY ENGINEERING-TRANSACTIONS OF THE ASME | 2007年 / 129卷 / 04期
关键词
D O I
10.1115/1.2769697
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Besides continuous implementation of concentrating solar power plants (CSP) in Europe, which stipulate cost reduction by mass production effects, further R&D activities are necessary to achieve the cost competitiveness to fossil power generation. The European Concentrated Solar Thermal Roadmap (ECOSTAR) study that was conducted by European research institutes in the field of CSP intends to stipulate the direction for R&D activities in the context of cost reduction. This paper gives an overview about the methodology and the results for one of the seven different CSP system concepts that are currently under promotion worldwide and considered within ECOSTAR. The technology presented here is the Parabolic trough with direct steam generation (DSG), which may be considered as an evolution of the existing parabolic systems with thermal oil as heat transfer fluid. The methodology is explained using this exemplary system, and the technical improvements are evaluated according to their cost-reduction potential using a common approach, based on an annual performance model. Research priorities are given based on the results. The simultaneous implementation of three measures is required in order to achieve the cost-reduction target: Technical improvement by R&D, upscaling of the unit size, and mass production of the equipment.
引用
收藏
页码:371 / 377
页数:7
相关论文
共 8 条
[1]  
Enermodal Engineering Ltd, 1999, COST RED STUD SOL TH
[2]  
JONES SA, 2003, ISES SOL WORLD C GOT
[3]  
JONES SA, 2001, P SOL FOR 2001 SOL E
[4]  
LUPFERT E, 2001, P SOL FOR 2001 SOL E
[5]  
Pitz-Paal R., 2005, SESCT2003502578
[6]  
ROY A, 1997, 3397 SOL PACES
[7]  
*SARG LUD, 2003, SL5641 SARG LUD
[8]  
ZARZA E, 2004, P 12 INT SOLARPACES