Production scheduling in SMT electronic boards assembly

被引:7
作者
Garetti, M [1 ]
Pozzetti, A [1 ]
Tavecchio, R [1 ]
机构
[1] CONSORZIO MILANO RIC,MILAN,ITALY
关键词
production scheduling; PCB assembly; makespan minimization;
D O I
10.1080/09537289608930342
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper tackles the problem of scheduling in the assembly of SMT electronic boards. In particular, it focuses on a new scheduling method developed within the framework of an industry-university joint research project. The scheduling system aims at minimizing the makespan; this goal is achieved by reducing setup times and idle times of the machines. As an example, the outcome of a rest carried out on a production mix made up of 10 board types is presented and analyzed in a summarized form.
引用
收藏
页码:197 / 204
页数:8
相关论文
共 10 条
[1]   PART ASSIGNMENT TO ELECTRONIC INSERTION MACHINES - 2 MACHINE CASE [J].
BENARIEH, D ;
DROR, M .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (07) :1317-1327
[2]  
BRANDOLESE A, 1988, P 3 INT C COMP AID P
[3]   GROUP SET-UP FOR PRINTED-CIRCUIT BOARD ASSEMBLY [J].
CARMON, TF ;
MAIMON, OZ ;
DAREL, EM .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1989, 27 (10) :1795-1810
[4]   AN ALGORITHM FOR THE WEEKLY PRODUCTION PLANNING OF FLEXIBLE ASSEMBLY SYSTEMS [J].
GARETTI, M ;
LANZA, C ;
POZZETTI, A .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1994, 7 (04) :249-259
[5]   A JUST-IN-TIME SIMULATION-MODEL OF A PCB ASSEMBLY LINE [J].
KUNG, HK ;
CHANGCHIT, C .
COMPUTERS & INDUSTRIAL ENGINEERING, 1991, 20 (01) :17-26
[6]  
RATURI AS, 1987, P 9 INT C PROD RES
[8]  
SUNDARAM RM, 1990, COMPUT IND ENG, V19, P47, DOI 10.1016/0360-8352(90)90075-W
[9]   AN EXAMINATION OF ROUTEING FLEXIBILITY FOR SMALL BATCH ASSEMBLY OF PRINTED-CIRCUIT BOARDS [J].
TAYLOR, D ;
GRAVES, RJ .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1990, 28 (11) :2117-2135
[10]   SCHEDULING ALGORITHMS FOR FLEXIBLE FLOW LINES [J].
WITTROCK, RJ .
IBM JOURNAL OF RESEARCH AND DEVELOPMENT, 1985, 29 (04) :401-412