Analysis of assembly systems with service level constraints

被引:32
作者
de Kok, TG [1 ]
Visschers, JWCH [1 ]
机构
[1] Eindhoven Univ Technol, Dept Math & Comp Sci, NL-5600 MB Eindhoven, Netherlands
关键词
assembly systems; divergent multi-echelon systems; service level constraints;
D O I
10.1016/S0925-5273(98)00236-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we propose a decomposition method for general assembly systems, that decomposes the assembly network into purely divergent multi-echelon systems. The key idea behind the method is to pre-allocate common components to (sets of) end-products. The decomposition method is inspired by Rosling's proof of the equivalence of pure assembly systems and serial multi-echelon systems. For the divergent multi-echelon systems it is possible to calculate near-optimal order-up-to-levels satisfying a fill rate constraint. These order-up-to-levels are then used in the original assembly system. We restrict detailed analysis to assembly systems that decompose into series inventory systems. Using discrete event simulation we compare our pre-allocation policies with several commonly used allocation policies. These allocation policies distribute the common components at the latest possible moment among orders of the subassemblies and end-products that use them. The simulation experiments show that the pre-allocation policies perform quite well compared to the allocation policies, both with respect to costs and service. (C) 1999 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:313 / 326
页数:14
相关论文
共 11 条
[1]  
BAKER R, 1986, MANAGE SCI, P982
[2]   HIERARCHICAL PRODUCTION PLANNING FOR CONSUMER-GOODS [J].
DEKOK, AG .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1990, 45 (01) :55-69
[3]  
DEKOK AG, 1997, INVENTORY CONTROL AS
[4]  
DIKS EB, 1996, 9609 COSOR EINDH U T
[5]   COMPONENT COMMONALITY WITH SERVICE LEVEL REQUIREMENTS [J].
GERCHAK, Y ;
MAGAZINE, MJ ;
GAMBLE, AB .
MANAGEMENT SCIENCE, 1988, 34 (06) :753-760
[6]   OPTIMAL AND HEURISTIC SOLUTIONS FOR A SIMPLE COMMON COMPONENT INVENTORY PROBLEM [J].
JONSSON, H ;
SILVER, EA .
ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 16 (04) :257-267
[7]  
Rosling K., 1989, OPER RES, V37, P365
[8]   COMPUTATIONAL PROCEDURES FOR STOCHASTIC MULTIECHELON PRODUCTION SYSTEMS [J].
VANHOUTUM, GJ ;
ZIJM, WHM .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1991, 23 (1-3) :223-237
[9]   DISTRIBUTION PLANNING FOR A DIVERGENT N-ECHELON NETWORK WITHOUT INTERMEDIATE STOCKS UNDER SERVICE RESTRICTIONS [J].
VERRIJDT, JHCM ;
DEKOK, AG .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1995, 38 (2-3) :225-243
[10]   Distribution planning for a divergent depotless two-echelon network under service constraints [J].
Verrijdt, JHCM ;
deKok, AG .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 89 (02) :341-354