A new line remedial policy for the paced lines with stochastic task times

被引:21
作者
Gökçen, H [1 ]
Baykoç, ÖF [1 ]
机构
[1] Gazi Univ, Dept Ind Engn, Fac Engn & Architecture, TR-06570 Ankara, Turkey
关键词
paced lines; line balancing; stochastic task times;
D O I
10.1016/S0925-5273(98)00123-6
中图分类号
T [工业技术];
学科分类号
08 [工学];
摘要
This study is based on investigating the effect of incompleted tasks on the line efficiency after balancing the stochastic ALE problem. For this purpose, a model allowing buffer storage between the stations in order to reduce the effect of incompleted tasks, is proposed. (C) 1999 Elsevier Science B.V. All rights reserved.
引用
收藏
页码:191 / 197
页数:7
相关论文
共 17 条
[1]
IGNALL EJ, 1965, J IND ENGINEERING, V16, P244
[2]
A COMPUTING PROCEDURE FOR A LINE BALANCING PROBLEM [J].
JACKSON, JR .
MANAGEMENT SCIENCE, 1956, 2 (03) :261-271
[3]
Kottas J., 1973, AIIE T, V5, P164, DOI DOI 10.1080/05695557308974897
[4]
Kottas J. F., 1976, AIIE Transactions, V8, P234, DOI 10.1080/05695557608975072
[5]
A STOCHASTIC LINE BALANCING PROCEDURE [J].
KOTTAS, JF ;
LAU, HS .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1981, 19 (02) :177-193
[6]
AN EXPLORATORY-STUDY ON STOPPING A PACED LINE WHEN INCOMPLETIONS OCCUR [J].
LAU, HS ;
SHTUB, A .
IIE TRANSACTIONS, 1987, 19 (04) :463-467
[7]
MANSOOR EM, 1966, J IND ENGINEERING, V17, P126
[8]
MOODIE CL, 1965, J IND ENGINEERING, V16, P23
[9]
RAMSING K, 1970, IND ENG, V2, P41
[10]
REEVE NR, 1973, AIIE T, V5, P223, DOI DOI 10.1080/05695557308974905