The impact of preventive maintenance on system cost and buffer size

被引:79
作者
Meller, RD [1 ]
Kim, DS [1 ]
机构
[1] GM CORP,CTR RES & DEV,CONSUMER & OPERAT RES DEPT,WARREN,MI 48090
关键词
maintenance; production systems; modeling; Markov processes;
D O I
10.1016/0377-2217(95)00313-4
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we consider a system with two production operations (typically machines) and a buffer between them. Our objective is to determine the optimal buffer inventory level, b*, that triggers preventive maintenance on the first production operation. We assume that periodic preventive maintenance will, in the long run, decrease the first production operation's failure rate. A cost model for the system is specified that includes the costs of preventive maintenance and unscheduled repairs, starving the second production operation, and inventory. The cost model is dependent on the values of performance measures that are a function of b*, which defines the preventive maintenance policy. We model the stochastic buffer content process of this system and obtain the performance measures with an embedded absorbing Markov chain analysis, Under certain scenarios, the implementation of the preventive maintenance program is shown to decrease the system cost and the output process variation. Furthermore, our model can be used to indicate oversized buffers in such an environment.
引用
收藏
页码:577 / 591
页数:15
相关论文
共 30 条
[1]  
ALLOWAY JA, 1991, IND ENG, V23, P44
[2]   A PREVENTIVE REPLACEMENT POLICY FOR UNITS SUBJECT TO INTERMITTENT DEMAND [J].
BERG, M .
OPERATIONS RESEARCH, 1984, 32 (03) :584-595
[3]   THE MARGINAL COST-ANALYSIS AND ITS APPLICATION TO REPAIR AND REPLACEMENT POLICIES [J].
BERG, MP .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 82 (02) :214-224
[4]  
Buzacott J.A., 1993, STOCHASTIC MODELS MA
[5]  
Buzacott J.A., 1967, INT J PRODUCTION RES, V5, P183, DOI [DOI 10.1080/00207546708929751, 10.1080/00207546708929751]
[6]   MULTISTAGE FLOW LINE ANALYSIS WITH THE STOPPED ARRIVAL QUEUE MODEL [J].
BUZACOTT, JA ;
LIU, XG ;
SHANTHIKUMAR, JG .
IIE TRANSACTIONS, 1995, 27 (04) :444-455
[7]   A SURVEY OF MAINTENANCE MODELS FOR MULTIUNIT SYSTEMS [J].
CHO, DI ;
PARLAR, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :1-23
[8]  
CONCANNON KH, 1990, IND ENG, V22, P22
[9]   THE ROLE OF WORK-IN-PROCESS INVENTORY IN SERIAL PRODUCTION LINES [J].
CONWAY, R ;
MAXWELL, W ;
MCCLAIN, JO ;
THOMAS, LJ .
OPERATIONS RESEARCH, 1988, 36 (02) :229-241
[10]   AN EFFICIENT DECOMPOSITION METHOD FOR THE APPROXIMATE EVALUATION OF TANDEM QUEUES WITH FINITE STORAGE SPACE AND BLOCKING [J].
GERSHWIN, SB .
OPERATIONS RESEARCH, 1987, 35 (02) :291-305