Perceptions of process quality in building projects

被引:34
作者
Arditi, D [1 ]
Gunaydin, HM
机构
[1] IIT, Dept Civil & Architectural Engn, Chicago, IL 60616 USA
[2] Izmir Inst Tech, TR-35230 Izmir, Turkey
关键词
D O I
10.1061/(ASCE)0742-597X(1999)15:2(43)
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A Delphi process and a questionnaire survey are conducted to investigate the differences in the perceptions of entry-level professionals and long-time practitioners with regard to process quality in building projects. The factors that affect process quality in the three phases (design, construction, and operation) of a building project's life cycle are identified and ranked by the respondents' perceived degree of importance. The findings indicate that the perceptions of entry-level professionals and long-time practitioners are in agreement for most (74%) of the factors. Given the differences in the respondents' background, expectations, and experience, differences in perceptions are to be expected in the remaining 26% of the factors. Analyzing these differences helps in revising and improving existing training courses and academic programs. It is recommended that college programs include courses that treat the administrative aspects involved in the building project in great detail and that continuing education programs cover quality training and life cycle cost analysis.
引用
收藏
页码:43 / 53
页数:11
相关论文
共 26 条
  • [1] [Anonymous], 1996, BEYOND REENGINEERING
  • [2] [Anonymous], DEMING DIMENSION
  • [3] Factors that affect process quality in the life cycle of building projects
    Arditi, D
    Gunaydin, HM
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1998, 124 (03) : 194 - 203
  • [4] Arditi D., 1984, Construct Manag Econom, V2, P193, DOI [10.1080/01446198400000018, DOI 10.1080/01446198400000018]
  • [5] ARDTITI D, 1997, INT J PROJ MANAG, V15, P235
  • [6] Covey S.R., 1990, 7 HABITS HIGHLY EFFE
  • [7] Crosby P., 1992, Completeness: Quality for the 21st century
  • [8] CROSBY PB, 1967, CUTTING COST QUALITY
  • [9] Delbecq AL., 1975, Group Techniques for Program Planning: A Guide to Nominal Group and Delphi Techniques
  • [10] Deming W. E., 1986, Out Of The Crisis