An approach to estimating work effort for enterprise systems software projects

被引:11
作者
Choi, J. [1 ]
Ashokkumar, S.
Sircar, S. [2 ]
机构
[1] Wright State Univ, Raj Soin Coll Business, Dept Informat Syst & Operat Management, Dayton, OH 45435 USA
[2] Miami Univ, Richard T Farmer Sch Business, Oxford, OH 45056 USA
关键词
Cost estimation; Enterprise applications; Industrial applications; Project management; Project schedule estimation; Requirements specifications; Software size estimation; Use case points; COSMIC-FFP;
D O I
10.1080/17517570601088356
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A major factor in the decision to develop enterprise software applications is the size of the project, which determines the amount of work necessary, which in turn will give decision makers some idea about the time required and the estimated cost. Two of the major approaches for such estimation-the Use Case Points (UCP) and COSMIC-FFP methods - are compared in this paper. The accuracy and reliability of each method are evaluated through the measurement of 50 use case studies. These were collected from the Customer Relationship Management systems development project of a major enterprise service institution. The results show that the UCP method is more accurate and reliable than the COSMIC-FFP in determining work effort.
引用
收藏
页码:69 / 87
页数:19
相关论文
共 16 条
[1]  
ABRAN A, 2001, COSMIC FFP MEASUREME
[2]  
Abran A., 2003, COSMIC IMPLEMENTATIO
[3]  
ABRAN A, 1998, REPORTE RECHERHE, V13, P1
[4]  
ANDA B, 2002, EASE 2002 EMPIRICAL
[5]  
[Anonymous], 1998, APPL USE CASES PRACT
[6]  
[Anonymous], 1979, P JOINT SHARE GUIDE
[7]  
Boehm Barry W., 1981, Software Engineering Economics, V1st
[8]  
CAROLL E, 2005, P ACM OOPSLA 05, P257
[9]   CHANGE-POINTS - A PROPOSAL FOR SOFTWARE PRODUCTIVITY-MEASUREMENT [J].
CHATMAN, VV .
JOURNAL OF SYSTEMS AND SOFTWARE, 1995, 31 (01) :71-91
[10]  
JENNER MS, 2001, P 4 EUR C SOFTW MEAS, P173