共 11 条
[1]
ARTIBA A, 1996, ICOQMS P JAIP 2, P467
[2]
BOTTA GV, 1996, THESIS U C BERNARD L
[3]
CAMPBELL HG, 1970, MANAGE SCI B-APPL, V16, pB630
[5]
GUINET A, 1996, WORKSH PROD PLANN CO, P299
[6]
Johnson S.M., 1954, NAV RES LOG, V1, P61, DOI DOI 10.1002/NAV.3800010110
[8]
A HEURISTIC ALGORITHM FOR THE M-MACHINE, N-JOB FLOWSHOP SEQUENCING PROBLEM
[J].
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE,
1983, 11 (01)
:91-95
[9]
Portmann M.C., 1997, PLANNING SCHEDULING
[10]
Riane F., 1997, 31097WR214 FUCAM