Robust capacity planning in semiconductor manufacturing

被引:66
作者
Barahona, F
Bermon, S
Günlük, O
Hood, S
机构
[1] IBM Corp, Thomas J Watson Res Ctr, Yorktown Hts, NY 10598 USA
[2] IBM Corp, Microelect Div, Hopewell Jct, NY 12533 USA
关键词
semiconductor; manufacturing; capacity planning; stochastic programming;
D O I
10.1002/nav.20086
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We present a stochastic programming approach to capacity planning under demand uncertainty in semiconductor manufacturing. Given multiple demand scenarios together with associated probabilities, our aim is to identify a set of tools that is a good compromise for all these scenarios. More precisely, we formulate a mixed-integer program in which expected value of the unmet demand is minimized subject to capacity and budget constraints. This is a difficult two-stage stochastic mixed-integer program which cannot be solved to optimality in a reasonable amount of time. We instead propose a heuristic that can produce near-optimal solutions. Our heuristic strengthens the linear programming relaxation of the formulation with cutting planes and performs limited enumeration. Analyses of the results in some real-life situations are also presented. (c) 2005 Wiley Periodicals, Inc.
引用
收藏
页码:459 / 468
页数:10
相关论文
共 23 条