Multi-resource shop scheduling with resource flexibility

被引:82
作者
Dauzere-Peres, S [1 ]
Roux, W
Lasserre, JB
机构
[1] Ecole Mines Nantes, F-44070 Nantes 03, France
[2] CNRS, LAAS, F-31077 Toulouse, France
关键词
scheduling theory; optimisation; multi-resource; resource flexibility; heuristics;
D O I
10.1016/S0377-2217(97)00341-X
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The shop scheduling problem tackled in this paper integrates many features that can be found in practical settings. Every operation may need several resources to be performed, and furthermore, a resource may be selected in a given set of candidates resources. Finally, we also consider that an operation may have more than one predecessor and/or more than one successor on the routing. The problem is then to both assign operations to resources and sequence operations on the resources, in order to minimize the maximum completion time. A disjunctive graph representation of this problem is presented and a connected neighborhood structure is proposed. The latter can be used to derive a local search algorithm such as tabu search. Finally, some numerical experiments are presented and discussed. (C) 1998 Published by Elsevier Science B.V. All rights reserved.
引用
收藏
页码:289 / 305
页数:17
相关论文
共 15 条
  • [1] BIANCO L, 1994, NAV RES LOG, V41, P959, DOI 10.1002/1520-6750(199412)41:7<959::AID-NAV3220410708>3.0.CO
  • [2] 2-K
  • [3] BRANDIMARTE P, 1993, ANN OPER RES, V41, P57
  • [4] A branch & bound algorithm for the open-shop problem
    Brucker, P
    Hurink, J
    Jurisch, B
    Wostmann, B
    [J]. DISCRETE APPLIED MATHEMATICS, 1997, 76 (1-3) : 43 - 59
  • [5] JOB-SHOP SCHEDULING WITH MULTIPURPOSE MACHINES
    BRUCKER, P
    SCHLIE, R
    [J]. COMPUTING, 1990, 45 (04) : 369 - 375
  • [6] Dauzere-Peres S., 1994, MANAGEMENT REPORT SE, V182
  • [7] An integrated approach for modeling and solving the general multiprocessor job-shop scheduling problem using tabu search
    DauzerePeres, S
    Paulli, J
    [J]. ANNALS OF OPERATIONS RESEARCH, 1997, 70 (0) : 281 - 306
  • [8] Glover F., 1993, Annals of Operations Research, V41, P3
  • [9] GUERET C, 1996, 5 INT WORKSH PROJ MA, P98
  • [10] HURINK J, 1994, OR SPEKTRUM, V15, P205, DOI 10.1007/BF01719451